My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DOAK
>
240
>
2800 - Aboveground Petroleum Storage Program
>
PR0528648
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:29:11 PM
Creation date
4/27/2020 4:07:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528648
PE
2832
FACILITY_ID
FA0019249
FACILITY_NAME
RIPON FUEL FACILITY
STREET_NUMBER
240
STREET_NAME
DOAK
STREET_TYPE
Blvd
City
RIPON
Zip
95366
APN
25933015
CURRENT_STATUS
01
SITE_LOCATION
240 Doak Blvd
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS REFERENCE MATRIX FOR ONSHORE NON-PRODUCTION FACILITIES <br /> Page <br /> Regulation Description Pagag <br /> §112.8())(1), <br /> §112.12(b)(1) Restrain drainage from diked areas;inspect accumulation 13 <br /> §112.8(b)(2), Manual valves to drain diked areas,inspect before 13 <br /> §112.12(b)(2) discharging into watercourse <br /> §112.8(b)(3), Undiked drainage designed to flow to ponds,lagoons,or 13 <br /> §112.12(b)(3) catchment basins <br /> §112.8(b)(4), <br /> §112.12(b)(4) Final discharge of ditch drainage controlled 13 <br /> §112.8(b)(5), Where pump transfer is needed,two lift pumps installed 13 <br /> §112.12(b)(5) with one installed permanently <br /> §112.8(c), Bulk storage containers 14 <br /> §112.12(c) <br /> §112.8(c)(1), Containers compatible with material and conditions of 14 <br /> §I 12.12(c)(1) storage <br /> §112.8(c)(2), Secondary containment for capacity of largest container and 14 <br /> §112.12(c)(2) sufficient freeboard for precipitation <br /> §112.8(c)(3), Not allow drainage of rainwater from diked areas unless 14 <br /> §112.12(c)(3) inspected and free of oil,records kept of drainage events <br /> §112.8(c)(4), Completely buried metallic containers corrosion protected, 14 <br /> §112.12(c)(4) leak testing conducted <br /> §112.8(c)(5), <br /> Partially buried containers corrosion protected 14 <br /> §112.12(c)(5) <br /> §112.8(c)(6), Integrity testing,visual plus non-destructive shell testing, 14 <br /> §112.12(c)(6) comparison records kept <br /> §112.8(c)(7), <br /> Internal heating coils monitored 14 <br /> §112.12(c)(7) <br /> §112.8(c)(8), <br /> §112.12())(8) Containers engineered to prevent discharges <br /> 14 <br /> §112.8(c)(8)(v), Liquid level sensing devices tested to ensure proper <br /> §112.12(c)(8)(v) operation <br /> §112.8())(9), <br /> §112.12())(9) Observe effluent treatment facilities to detect system upsets 15 <br /> §112.8(c)(10), <br /> §112.12(c)(10) Correct visible leaks and remove accumulations of oil 15 <br /> §112.8(c)(11), Secondary containment for mobile/portable containers with <br /> §112.12(c)(11) capacity of largest container& sufficient freeboard for 15 <br /> precipitation <br /> vi <br /> �.li CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.