My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DOAK
>
240
>
2800 - Aboveground Petroleum Storage Program
>
PR0528648
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:29:11 PM
Creation date
4/27/2020 4:07:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528648
PE
2832
FACILITY_ID
FA0019249
FACILITY_NAME
RIPON FUEL FACILITY
STREET_NUMBER
240
STREET_NAME
DOAK
STREET_TYPE
Blvd
City
RIPON
Zip
95366
APN
25933015
CURRENT_STATUS
01
SITE_LOCATION
240 Doak Blvd
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL PREVENTION,CONTROL,AND <br /> COUNTERMEASURES PLAN <br /> City of Ripon <br /> Fueling Station <br /> 240 Doak Boulevard <br /> Ripon,California,95366 <br /> SPCC Plan Preparation Prior to Facility Becoming Operational? <br /> [40 CFR 112.3(b)(1)] <br /> ❑ Yes <br /> ® No <br /> Original Date of Plan: ...................................................................January 29,2020 <br /> Date of Last Plan Amendment/P.E. Certification: ........................January 29,2020 <br /> Date of Last Plan Review: ............................................................January 29,2020 <br /> Next review date on or before:.......................................................January 29,2025 <br /> Designated Person Accountable for Spill Prevention: <br /> James Pease,Deputy Director of Public Works <br /> 259 North Wilma Avenue <br /> Ripon, California, 95366 <br /> (209)599-2108 <br /> CERTIFICATION <br /> [40 CFR 112.3(d)] <br /> My representative has visited the Facility and, being familiar with the provisions of 40 CFR Part 112, I <br /> attest that this Spill Prevention, Control, and Countermeasures Plan (SPCC) Plan has been prepared in <br /> accordance with good engineering practices, including consideration of applicable industry standards,that <br /> procedures for required inspections and testing have been established, and this Plan is adequate for the <br /> Facility. <br /> City of Ripon is solely responsible for implementation of this SPCC Plan. This SPCC Plan is not complete <br /> without full implementation of the requirements of 40 CFR Part 112. <br /> Engineer: Robert . ob o0ROFESSIn <br /> Signature: L C 51592 rn <br /> * <br /> EXP.6,W/2020 <br /> Registration Number: C 51 92 sj CIVIC �p <br /> qOF CAL'FOQ� <br /> State: California SEAL <br /> Date: January 29, 2020 <br /> ii <br /> +•,: CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.