My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DOAK
>
240
>
2800 - Aboveground Petroleum Storage Program
>
PR0528648
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:29:11 PM
Creation date
4/27/2020 4:07:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528648
PE
2832
FACILITY_ID
FA0019249
FACILITY_NAME
RIPON FUEL FACILITY
STREET_NUMBER
240
STREET_NAME
DOAK
STREET_TYPE
Blvd
City
RIPON
Zip
95366
APN
25933015
CURRENT_STATUS
01
SITE_LOCATION
240 Doak Blvd
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL PREVENTION,CONTROL,AND COUNTERMEASURES <br /> COMPLIANCE INSPECTION PLAN <br /> REVIEW PAGE <br /> City of Ripon <br /> Fueling Station <br /> In accordance with 40 CFR 112.5(b), a review and evaluation of this Spill Prevention, Control, and <br /> Countermeasures (SPCC) Plan is conducted at least once every 5 years'. As a result of this review and <br /> evaluation,City of Ripon will amend the SPCC Plan within 6 months of the review to include more effective <br /> prevention and control technology if: (1)such technology will significantly reduce the likelihood of a spill <br /> event from the facility, and (2) such technology has been field-proven at the time of review. Any <br /> amendment to the SPCC Plan shall be certified by a Professional Engineer within 6 months after a change <br /> in the facility design,construction,operation,or maintenance occurs which materially affects the Facility's <br /> potential for the discharge of oil into or upon the navigable waters of the United States or adjoining <br /> shorelines. <br /> Review Dates Comment Signature Amens! Site <br /> !) Pian Evaluation <br /> 1. January 29,2020 New Plan �J ®Yes NYes <br /> o 0 N <br /> 2 / Dyes Dyes <br /> ❑No ❑No <br /> 3 Dyes Dyes <br /> []No ❑No <br /> 4 Eyes Dyes <br /> ❑No ❑No <br /> 5 ❑Yes ❑Yes <br /> ❑No ❑No <br /> Dyes El Yes <br /> 6. ❑No ❑No <br /> 'NEXT REVIEW DATE ON OR BEFORE JANUARY 293 2025 <br /> MANAGEMENT APPROVAL <br /> City of Ripon is committed to the prevention of discharges of oil to navigable waters and the environment, <br /> and maintains high standards for spill prevention, control, and countermeasures through regular review, <br /> update, and implementation of this Spill Prevention,Control, and Countermeasures Plan. <br /> Authorized Facility Representative: <br /> Signature: aa_ <br /> �51 <br /> Name: J+MFS 1P <br /> Name: (I <br /> Title: bSQkCrof_ <br /> n <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.