My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_1986 - 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 10:14:57 AM
Creation date
4/28/2020 9:10:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1994
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e3i11i94 09:58 N0.887 W7 <br /> Installation of the LD-2040 <br /> Before Installation: <br /> 1. Purge the system of any air. Start at the dispenser furtherest from the�submersible pump <br /> and work your way back toward the pump. The amount of product you will have to purge <br /> depends upon the amount of air In the system and where the air is located. On a new system <br /> start-up, it is always better to purge the system before setting the dispensers. The reason is <br /> that you can get more volume through the line without the restriction of the dispenser and <br /> the delivery nozzle. However, purging the system before setting the dispensers may not always <br /> be possible. <br /> 2. Check the bleed-down pressure on the submersible pump. This check is to make sure that <br /> an excessive amount of pressure is not maintained in the system with the LD-2000 installed. <br /> This test is done before installation of the LD-2000 by simply installing the leak detector tester <br /> in the test port of the impact valve. With the tester in the OFF position, turn on the <br /> submersible pump. Make sure that the line pressure is at full flow or operation pressure. Turn <br /> off the submersible pump and notice the pressure that is locked in the line. <br /> 3. Run a precision line test. Before replacing an existing leak detector, a precision line test <br /> should be conducted to ensure line integrity. A line test should also be conducted when <br /> installing a leak detector in the system for the first time. Not only will the line test tell you if <br /> the line is leaking, but It will also tell you how much line resiliency is in the system. It will also <br /> help do some system diagnostics. <br /> To Install the LD-2000: <br /> 1. Shut off the power to the submersible pump at the breaker box, <br /> 2. Go to the submersible pump and remove the existing leak detector or 2-inch pipe plug in <br /> the submersible pump or adaptor tee. <br /> 3. Make sure that the submersible pump or adaptor tee will accommodate the LD-2000. To do <br /> this, make sure that there is enough room for the check valve on the bottom of the leak <br /> detector. Also make sure the threads on the leak detector and the submersible pump are clean <br /> and not damaged. <br /> [blaming! The check valve on the bottom of the LD-2000 is very delicate. Handle it with care. <br /> Do not use the check valve to pick up or handle the leak detector. Do not drop the leak <br /> detector. Inspect leak detectors very carefully before Installing them in a system. Make sure <br /> that there is no damage prior to installation. Damage incurred due to misuse or abuse will void <br /> the warranty of the LD-2000.] <br /> l:_J <br />
The URL can be used to link to this page
Your browser does not support the video tag.