My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995 - 1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_1995 - 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 11:50:13 AM
Creation date
4/28/2020 10:07:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 - 1998
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d) mail, when submitted to, ARCO, at the address specified in paragraph 1 of the PMPA Franchise <br /> Agreement/Dealer/Premises Lease, a copy of all reports submitted to overnment agencies; <br /> (e) follow all operating procedures specified by ARCO; <br /> (f) immediately report to ARCO all suspected or confirmed releases from the tanks and connected <br /> piping system, unusual operating conditions, release detection signals and environmental conditions <br /> suggesting a release may have occurred, and any spills and overfills that are not contained and cleaned <br /> up; <br /> (g) properly close the underground tanks as required by law; and, <br /> (h) comply with all federal, state, and local legal requirements relevant to the operations of the <br /> underground tanks and all amendments to any permit to operate. <br /> 4. With respect to the operation of the underground storage tank system and monitoring equipment, <br /> Franchisee hereby acknowledges and agrees: <br /> - that ARCO has provided Franchisee with training on each of the items described in the <br /> attached Monitoring and Response Plan, <br /> - that Franchisee understood the content of the training, and asked any questions necessary to <br /> facilitate his understanding, <br /> - that Franchisee indicated to ARCO at the time of training any subjects addressed by the <br /> training which Franchisee did not fully understand, and, <br /> - that Franchisee received complete training and information necessary for Franchisee to fully <br /> understand the subject of operating underground storage tanks. <br /> 5. ARCO has provided Franchisee a copy of and Franchisee agrees to maintain on the Premises the <br /> Certificate of Financial Responsibility (as required by the United States Environmental Protection Agency <br /> in Subpart H, 40 CFR, Part 280 and California Health and Safety Code, Chapter 6.7, Section 25292.2). <br /> 6. Except to the extent that conflict with, or are less rigorous than the terms of this Amendment, all of <br /> the terms and conditions of the PMPA Agreement, as previously or hereafter amended or supplemented, <br /> remain in full force. <br /> IN WITNESS WHEREOF, ARCO and Franchisee have executed this Amendment. <br /> ARCO Products Company, Franchisee <br /> a division of AtlanticRichfleldCompany <br /> v <br /> bat6 Gary L urgin ate <br /> 0/kw <br /> � b 9� <br /> Witness D to Witness Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.