My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
935
>
3500 - Local Oversight Program
>
PR0545617
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 1:16:20 PM
Creation date
4/28/2020 12:53:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545617
PE
3528
FACILITY_ID
FA0005557
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
935
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/2011
CURRENT_STATUS
02
SITE_LOCATION
935 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> INTERIIII WORK PLAN <br /> FOR MONITORING WELL INSTAL ATION <br /> Ripon Farm Service <br /> 22871 South Highway 99 <br /> Ripon, California ' <br /> February 1995 <br /> 1.0 INTRODUCTION <br /> In accordance with a request from Mr. Bruce McCandless of Ripon Farm Service, <br /> Geological Audit Services, Inc. (GeoAudit) has prepared this iInterim Work Plan for the <br /> drilling and installation of additional borings and monitoring wells at 22871 South Highway <br /> 99 in Ripon, California (the site). The location of the siteis illustrated on Figure 1. A pian <br /> of the site is illustrated on Figure 2. <br /> 2.0 BACKGROUND j <br /> I <br /> 2.1 Site Location <br /> The site is located in a flat industrial area in northern i�Ripo east of Jack Tone Road <br /> (Figure 1). The site is operated by Ripon Farm Service (RFS). An automotive shop is <br /> located near the northeast corner of the site; an office buildinpland truck scale are located <br /> at the southern corner. The surface of the remainder of the (site is covered with gravel. <br /> Jimco Truck Stop is located immediately north of the site. <br /> 2.2 Underground Storage Tank Removal <br /> - I <br /> It is our understanding that four underground storage tank's (USTs) were removed from the <br /> site on July 15, 1987. One 10,000-gallon diesel UST (Tank #1) and one 7,000-gallon diesel <br /> UST (Tank #2) were located near the tuning shop; onej�.10,00,0-gallon unleaded gasoline <br /> tank (Tank #3) and on 10,000-gallon diesel tank (Tank #4,) were located approximately 120 <br /> feet east of the shop (Figure 2). <br /> One soil sample was collected below each UST. The samples were collected at depths <br /> IL <br /> between 18 and 21 feet. Petroleum hydrocarbons were det'ected'in samples collected below <br /> tanks #1, #2 and #3 at the time of removal. Therefore, the San Joaquin County Public <br /> Health Services-Environmental Health Division (PHS/EHD) required further investigation <br /> 11 <br /> to determine the full extent of the soil and/or groundwater problem. <br /> O—IgC—i A.&I Se k-,Inc. 1 <br /> RIPON FARM SERVICE I AT/2 95151C-9143.923-M <br />
The URL can be used to link to this page
Your browser does not support the video tag.