My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
935
>
3500 - Local Oversight Program
>
PR0545617
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 1:16:20 PM
Creation date
4/28/2020 12:53:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545617
PE
3528
FACILITY_ID
FA0005557
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
935
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/2011
CURRENT_STATUS
02
SITE_LOCATION
935 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 13) Collect one groundwater sample from each boring on the Jimco property via <br /> hydropunch or similar method. l <br /> 14) Complete two borings as two-inch diameter mol itoring well. The wells will be <br /> completed in accordance with the well design depicted in Figure 3. <br /> 15) Backfill the remaining borings with neat cement. <br /> 16) Survey the top of each well casing to determine he elevation relative to existing <br /> wells. <br /> 17) No sooner than 48 hours after installation, measure to the nearest 0.01 foot, the <br /> static water level in the new wells. <br /> 18) Remove standing water from each well. A bailer cr submersible pump will be used <br /> to surge and purge each well. A minimum of three weldivolummes of water will be <br /> removed from each well to stabilize pH, temperature and conductivity. Parameters <br /> will be measured at one-gallon intervals. After wells have stabilized, samples will be <br /> collected using disposable plastic bailers. <br /> 19) Store purge water in 55 gallon DOT drums on-site) pending analytical results. <br /> 20) Label and log water samples on a chain-of-custod 'form. <br /> 21) Store soil and.groundwater samples in a chilled container and transport to a state- <br /> certified laboratory for analysis. Water samples will�Ilccordance <br /> e analyzed far TPH as gasoline <br /> and diesel and volatile aromatics (BTE&CX), rn with EPA methods <br /> 5030/8015 and 602, respectively. j <br /> 21) Prepare a report detailing the procedures and results of the investigation. Upon <br /> approval of the Client, the report will be submitted to the PHS /EHD and the Central <br /> Valley Regional Water Quality Control Board (CVRWQCB). <br /> The opportunity to prepare this work plan is greatly appreciated. If you have any questions <br /> or comments, please contact our office. <br /> Sincerely, <br /> GEOLOGICAL AUDIT SERVICES, INC. <br /> I <br /> Shelly Walker <br /> Staff Geologist <br /> a-bswl A.&i Se ki Inc. A <br /> MIMN FARM SERVICE IMAM-9USC-94-Mr—A-02 `F <br />
The URL can be used to link to this page
Your browser does not support the video tag.