Laserfiche WebLink
110. . 760 7671 07-,7Og 0 Jan. 14 2204 10:`_G;;l P3 <br /> 2 <br /> Efftuel� <br /> High water level alarm shutdown float switch (N.C.) <br /> Discharge Pump level control moat switches) (N.O.) <br /> 'discharge pump 2HP 30 230v TEFC 10 gpm 0 104TDH <br /> Skid Mounting: Fabricated Frame with Control & instrument Stanchion <br /> - �arstral PaEJ�� _ <br /> control panel 230v 30, NEMA 4 enclosure: inc'uding: <br /> main disconnect; <br /> adjustable timers (tor Shallow T ray blower intermittent operation) <br /> motor starters with thermal overload protection <br /> run lights, green <br /> alarm lights; red <br /> H-O-.A switches <br /> Int of alarm interlocks, fuses and relays <br /> AIarms <br /> ShallowTray Air Line VSHH <br /> ShalloviTray Air Use VSLL <br /> ShaflowTray sump LSHH <br /> [ota! Model 131-P System Price, Including options, US$ <br /> Ch: <br /> Blower is sized for the ShaliowTray(D plus 12"we for a TO. <br /> Ter hpnenV <br /> Each ShallowTray system is shipped pre-assernbled and factory tested, and an C&M manual is <br /> included with each unit. Normal shipment is t 4 weeks after recalpt of authorized purchase order, <br /> submittal approval, or Notice-To-Proceed (NTP). FOS West Lebanon, NH <br /> Standard payment terms are net 30 days from shipment.. <br /> Proposal is valid for 90 days <br /> Sincerely, <br /> Gordon <br /> f <br /> I n t e g r a t e d E n v I r o n m e n t a I T e c `: n o l o g i e s <br /> I <br /> i <br />