My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 1:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> �°•_� �o Unit Supervisors <br /> Donna K.Heran,R.E.H.S. Carl Bor man,R.E.H.S. <br /> Director 304 East Weber Avenue, Third Floor Borg <br /> man, <br /> Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> �.. ��• Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Fo. a p <br /> Laurie A.Cotulla,R.E.H.S. Fax: (209).464-0138 Robert McCfellon,R.E.H.S. <br /> Program Manager Mark Barcellos,R.E.H.S. <br /> RAY BAGLIETTO & FRANK RAUZI <br /> TULEBURGE WAREHOUSE FEB 13 2003 <br /> 301 AURORA ST <br /> STOCKTON CA 95202 <br /> RE: SPEEDY FOOD ASART <br /> 8200 N HWY 99 <br /> STOCKTON CA 95212 <br /> Environmental Health Department (EHD) has received and reviewed w1orkplan far Additional <br /> Subsurface Investi,gation and Feasibility Evaluation (the work plan) dated September 25, 2002 <br /> prepared by Ground Zero Analysis, Inc. (Ground Zero). The work plan proposed installing <br /> four monitoring wells at the site to define the vertical and lateral extent of the soil and <br /> groundwater contamination,but stated six wells in scope on Page 1. EHD will consider <br /> only the four proposed wells indicated on the map (Figure 5): two shallow monitoring wells <br /> targeted for the upper water-bearing zone, a deep well targeted for 200 to 220 feet below <br /> surface grade (bsg), and an SVE well for the purpose of conducting the SVE pilot test. The <br /> work plan also proposed performing a one-day soil vapor extraction (SVE) pilot test to <br /> evaluate subsurface conditions for suitability of SVE technology. For the deep zone <br /> monitoring well a conductor casing will be installed to 110 feet bsg, and a continuous core <br /> will be obtained from 110 feet bsg to total depth. <br /> On December 16, 2002, EHD discussed with Ground Zero by telephone modifications to <br /> the work plan. Please submit a work plan addendum addressing the following items to <br /> EHD by March 31, 2003: <br /> • Procedures and design for installation of an interim remediation pump and treat <br /> (P &'I) system to EHD. <br /> Due to the high solubility and low sorption properties of the chemical methyl <br /> text-butyl ether (MTBE), consistent detection of MTBE at concentrations <br /> exceeding 10,000 ltg/l in the monitoring wells, and the presence of multiple <br /> down gradient private drinking wells (in the area of Gnekow Drive) within <br /> 2000 feet of the site that are likely to be exerting a pumping influence on the <br /> contamination plume, EHD requests that the installation of an interim <br /> remediation system to control the migration of the MTBE plume be placed <br /> in first priority. Submit a proposal and procedures in the work plan <br /> addendum for installation of a P &T system at the site by March 31,2003. <br /> Install an interim groundwater remediation system no later than May 15, <br /> 2003. <br />
The URL can be used to link to this page
Your browser does not support the video tag.