My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 1:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> Speedy Market .� ILIf <br /> Page 2 <br /> 4. SMWS will need to provide the Department with data that demonstrates the new source can <br /> provide an adequate quality and quantity of eater according to the California Water Works <br /> Standard(pump tests,meter readings, etc.). <br /> he <br /> 5. Within 60 days of completion u�r d well, <br /> Health andt the Safety{H&S)Codller's well 109 to e,Section Department6530 d an <br /> updated technical report as q Y <br /> 6. Within 60 days of completion <br /> of ulm"and storage anksto the Dinluding he pump curve manufacturer's <br /> data sheet. <br /> specification sheets for t pump <br /> 7. Complete and submit the enclosed Sample Siting Plan for bacteriological sampling. Please <br /> contact this office for assistance in completing his form. <br /> The following issues are not conditions of the SMWS water permit but are concerns of the Department that <br /> should be considered. <br /> 1. The Department would encourage ShiWS to incorporate a flow meter on the well. It can be a <br /> useful tool in the overall water-monitoring program. It is a helpful tool to determine periods of <br /> high demands that are acceptable and non-acceptable (leak detection). <br /> 2. The Department strongly encourages SMWS to secure the well site with fencing in a manner that <br /> will provide staff's access for maintenance and operation. <br /> Upon EHD approval of new Well#2 source the destruction of old Well#1 maybe proceed under permit a - <br /> and inspection by EHD. The casing of Well rl shall be filled with 6-sack cement or greater.to three feet <br /> below grade. The casing shall be perforated as proposed in the December 41 2000,Workplan using <br /> Cyclonite jet charges(or equivalent)with the grout in place at time of detonation. <br /> If you have any questions regarding this matter please contact Adrienne Ellsaesser at(209)468-0343 or <br /> Willy Ng at(209)468-3448. <br /> Donna Hcran,R.E.H.S. <br /> Director of Environmental Health <br /> esser .E.H.S. Margaret Lagorio,R.E.H.S. <br /> Adrienne Ellsa Sr,, . Unit Iv Supervisor <br /> Lead Senior <br /> cc: Joseph O. Spano,P.E.,Drinking Water Field Operations Branch <br /> Gene Reade,Drinking Water Field Operations Branch <br />
The URL can be used to link to this page
Your browser does not support the video tag.