Laserfiche WebLink
Exhibit A <br /> ' ESTIMATED BUDGET <br /> FOR PROJECTS 1 AND 3 <br /> at <br /> $200 North Highway 99 <br /> Stockton, California ; <br /> PROJECT DOMESTIC WATER WELL <br /> Determine Depth to Water and Sample Water Well <br /> Project Geologist $ 85.00 per hour I hr $ $5.00 <br /> Staff Technician $ 50.00 per hour 4 hrs $ 200.00 <br /> Equipment/Mileage $ 100.00 per day I day $ 100.00 <br /> Analytical Fees <br /> Coliform bacteria $ 21.00 per sample I sample $ 21.00 <br /> EPA 524.2 w/oxygenates $ 144.00 per sample 1 sample $ 144,00 <br /> Well Search <br /> Project Geologist $ 85.00 per hour I hr $ 85,00 <br /> v Staff Geologist $ 70.00 per hour 4 hrs $ 280,00 <br /> ..PROJECT i TOTAL $ 915.00 <br /> PROJECT -SOIL& GROUNDWATER INVESTIGATION <br /> Drilling,soil &groundwater sampling, laboratory analysis <br /> CPT drilling subcontractor $ 4,991.00 <br /> Project Geologist $ 85.00 per hour 1 hr $ 85,00 <br /> Staff Geologist $ 70.00 per hour 20 hrs $ 1,400,00 <br /> Equipment/Mileage $ 75.00 per day 2 days $ 250.00 <br /> Analytical Fees <br /> TPHg, BTEX $ 52.00 per sample 10 samples $ 520.00 <br /> 8260--oxygenates $ 144.00 per sample 10 samples $ 1,440.00 <br /> Swrrrnary report preparation <br /> Registered Geologist $ 105.00 per hour 2 hrs $ 210.00 <br /> -.Project Geologist $ $5.00 per hour 2 hr $ 170.00 <br /> Staff Geologist $ 70.00 per hour 10 hrs $ 700,00 <br /> Draftsperson $ 45.00 per hour 2 hrs $ 90.00 <br /> Administration $ 40.00 per hour 1 hr $ 40,00 <br /> '. ! <br /> PROJECT 3 TOTAL <br /> _ _ $ 99796.00 <br /> i <br /> pf0 untGr,X�S <br /> 4tl <br />