My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 1:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> p�QUJN' C Environmental Health Department DIRECTOR <br /> ?' = � Donna Heran,REHS <br /> 600 East Main Street <br /> { Stockton, California 95202-3029 PROGRAMCpORRS <br /> '•• �, s RobeertrtMcClelfon,REHS <br /> Jeff Carruesco,REHS, RDI <br /> oq�� w Website: www.sjgov.org/ehd Kasey Foley, REHS <br /> �°R Phone: (209)468-3420 Linda Turkatte,REHS <br /> Fax: (209) 464-0138 <br /> September 28, 2010 <br /> Ray Baglietto & Frank Rauzi Ab Nawar <br /> Tuleburg Warehouse 8200 North Highway 99 <br /> 301 South Aurora Street Stockton, CA 95212 <br /> Stockton, CA 95203 <br /> Subject: Speedy Foods <br /> 8200 North Highway 99 <br /> Stockton, CA 95212 <br /> WORK PLAN: Well Destruction & Site Restoration APPROVED: [X] <br /> DATED: September 24, 2010 <br /> PREPARED BY: Ground Zero Analysis, Inc. <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10(c)(3)].- <br /> 1. Destruction by over-drilling of four groundwater monitoring or remediation wells. <br /> 2. Destruction by pressure grouting of eight groundwater monitoring or remediation wells. <br /> 3. Removal of all equipment related to the site investigation or remediation, and tilling of <br /> conveyance piping with grout. <br /> 4. Preparation of a report of findings to be submitted to the EHD within 60 days following <br /> completion of all well destruction activities. <br /> COMMENTS AND CONDITIONS: <br /> 1. Wells destroyed by over-drilling must be drilled to total dept of the original borehole. <br /> 2. Forty-eight hours notice to the EHD is required prior to all site fieldwork. <br /> I <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN [H& S 25296.10 (c)(3)]: None <br /> Lori Duncan, REHS <br /> Senior Registered Environmental Health Specialist <br /> cc: Eric Price, Ground Zero Analvsis. 1713 First Street. Escalon. CA 95320 <br />
The URL can be used to link to this page
Your browser does not support the video tag.