Laserfiche WebLink
San Joaquin County <br /> p�QUJN' C Environmental Health Department DIRECTOR <br /> ?' = � Donna Heran,REHS <br /> 600 East Main Street <br /> { Stockton, California 95202-3029 PROGRAMCpORRS <br /> '•• �, s RobeertrtMcClelfon,REHS <br /> Jeff Carruesco,REHS, RDI <br /> oq�� w Website: www.sjgov.org/ehd Kasey Foley, REHS <br /> �°R Phone: (209)468-3420 Linda Turkatte,REHS <br /> Fax: (209) 464-0138 <br /> September 28, 2010 <br /> Ray Baglietto & Frank Rauzi Ab Nawar <br /> Tuleburg Warehouse 8200 North Highway 99 <br /> 301 South Aurora Street Stockton, CA 95212 <br /> Stockton, CA 95203 <br /> Subject: Speedy Foods <br /> 8200 North Highway 99 <br /> Stockton, CA 95212 <br /> WORK PLAN: Well Destruction & Site Restoration APPROVED: [X] <br /> DATED: September 24, 2010 <br /> PREPARED BY: Ground Zero Analysis, Inc. <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10(c)(3)].- <br /> 1. Destruction by over-drilling of four groundwater monitoring or remediation wells. <br /> 2. Destruction by pressure grouting of eight groundwater monitoring or remediation wells. <br /> 3. Removal of all equipment related to the site investigation or remediation, and tilling of <br /> conveyance piping with grout. <br /> 4. Preparation of a report of findings to be submitted to the EHD within 60 days following <br /> completion of all well destruction activities. <br /> COMMENTS AND CONDITIONS: <br /> 1. Wells destroyed by over-drilling must be drilled to total dept of the original borehole. <br /> 2. Forty-eight hours notice to the EHD is required prior to all site fieldwork. <br /> I <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN [H& S 25296.10 (c)(3)]: None <br /> Lori Duncan, REHS <br /> Senior Registered Environmental Health Specialist <br /> cc: Eric Price, Ground Zero Analvsis. 1713 First Street. Escalon. CA 95320 <br />