Laserfiche WebLink
TABLE 1 <br /> SUMMARY OF CARBON USAGE <br /> 8200 N. Highway 99, Stockton, CA <br /> Gallons through Mass Removed Load Air Load C1 Load C2 <br /> Date Range Components (TAHg+BTBX+MTBE)in Stripper Notes <br /> System (pounds) (pounds) <br /> pounds (pounds) <br /> 12/04/03 to 07126104 C1 (lead),C2(trail),200 324,342 95.1 0 95.1 0 No Air Stripper,Virgin carbon <br /> Ib polish in C1 and C2 <br /> Air Stripper,C1 (lead), 95%Air Stripper efficiency, <br /> 07/26/04 to 10!26!04 C2(trail),200-Ib polish 32510 11.3 11.3 0.6 0 breakthrough in C1 on <br /> 10126!04 <br /> Air Stripper,C1 (lead), Breakthrough in C1 on <br /> 10!26!04 to 12/20/04 C2(trail),200-Ib polish 149307 11.5 11.5 0.9 0.9 10126104,92%Air Stripper <br /> efficiency <br /> 12/20/04 to 01/18/05 C2(lead),C1 (trail) 52309 1.8 0 0 1,8 Virgin Carbon in C1,No Air <br /> Stripper <br /> 01!18105 to 02/24/05 Air stripper,C2(lead), 101171 4.7 4.7 0 0.8 82%Air Stripper efficiency <br /> C1 (trail) <br /> Assume 82%Air Stripper <br /> 02/24/05 to 03108105 Air stripper,C1 55188 2.7 2.7 0.5 0 efficiency,C2 offline due to <br /> scaling <br /> i <br /> 1 <br /> Air stripper,C2(lead),trail 44047 6Assume 82%Air Stripper <br /> 03!08105 to 03!18!05 C1 .0 6.0 0 1. <br /> (trail) efficiency <br /> Assume 82%Air Stripper <br /> efficiency,C2 offline due to <br /> 03118!05 to 03/30/05 Air stripper,C1 39357 5.4 5,4 1.0 0 scaling,samples could not be <br /> collected as scheduled on <br /> 03130!05 because system was <br /> down upon arrival <br /> 03/34105 to 05/10/05 System down 0 0 0 0 0 Both C1 and C2 have scaling,system idle <br /> 05/10/05 to 05112!05 Air stripper,C2{lead}, 8823 0.6 0.6 0 0 1 Assume 82%Air Stripper <br /> C1 (trail) efficiency <br /> Assume 82%Air Stripper <br /> 05/12/05 to 05/13/05 Air stripper,C2 996 0.1 0.1 0 0.01 efficiency,C1 offline due to <br /> backpressure <br /> 05/13/05 to 05/16/05 System down 0 0 0 0 0 <br /> Air stripper,C2(lead), Assume 82%Air Stripper <br /> 5116!05 to 05/31/05 35260 3.1 3.1 0 0.6 <br /> C1 (trail)) efficiency <br /> I <br /> Based upon first change-out,breakthrough expected after load of 95.1 lbs to lead carbon unit <br /> Breakthrough actually occurred after estimated 47.2 lbs through stripper,3.0 lbs through C1,and 5.3 lbs through C2 <br />