My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 1:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTIYDEPARTMENT <br /> PQUrM <br /> UIN COUNTY SAN JOA <br /> Q <br /> •,,, � Donna K.Heran,R.E.H.5. Unit Supervisors <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> •`• Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins, , S.,R.D.I. <br /> c'::_ a • Program Manager Douglas W.Willsonson,R.E.H.S. <br /> a�rFo'RN. Laurie A.Cotulla,R.E.H.S. Telephone: (209) 46$-3420 Margaret Lagorio,R.E.H.S. <br /> Fax: (209) 464-0138 Robert McClellon,R.E.H.S, <br /> Program Manager Mark Barcellos,R.E.H.S. <br /> I <br /> RAY BAGLIETTO & FRANK RAUZI <br /> TULEBURGE WAREHOUSE <br /> 301 AURORA ST <br /> STOCKTO14 CA 95202 <br /> RE: SPEEDY FOOD MART <br /> 8200 N HWY 99 <br /> STOCKTON CA 95212 <br /> WORKPLAN: Work Plan to Destroy Monitoring Well MW2 DATED: February 17, 2005 <br /> PREPARED BY: Ground Zero Anal4sis Inc. (Ground Zero _ <br /> APPROVED /X with Conditions (See Below) <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S <br /> 2529610(c)(3).): <br /> Destroy groundwater well MW-2. Work is scheduled on site on March 1, 2005. <br /> COMMENTS AND CONDITIONS: <br /> The work plan proposed destroying MW-2 by pressure grout. San Joaquin County Well <br /> Standards, Section 13.17.6,requires a monitoring well located in an area of known or suypected <br /> pollution or contamination... be destroyed by reniouing a!!material avithin the original borehole (including the <br /> well casing, screen,filterpack, and annular seal);and the created hole filled completely-u ith appropriate <br /> sealing material. Therefore, destruction of MW-2 by pressure grout is not approved. San <br /> Joaquin County requires the well be destroyed by over-drilling, explosives, or other methods <br /> that will meet San Joaquin County Well Standards. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN (H&S 25296.10(C)(3).): <br /> (See above comments) <br /> DATED February 18, 2005 BY t <br /> Cc: CRWQCB, Central Valley Region—James L.L. Bar on, RG <br /> Cc: Ground Zero Analysis, Inc. —John P. Lane, RG <br /> Cc: Freeman,D'Aiuto,Pierce, Gurev,Keeling&Wolf—Lee Roy Pierce,Jr.,JD., BA <br /> Cc: San Joaquin County Deputy District Attorney--David Irey <br />
The URL can be used to link to this page
Your browser does not support the video tag.