Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> pQuIN SAN JOAQUIN COUNTY <br /> Donna K.Hcran,R.E.H.S. UnitSuper"isor;c <br /> i <br /> Director 304 East Weber Avenue, Third Floor Carl Borgnian,R.E.H.S. <br /> �' Mike Huggins,R.E.14.S„R,I�.I. <br /> • '• Al Olsen,R.E.H.S. Stockton, Ca1if01"r11a 95202-270$ <br /> Program W.Wilson,R.E.H.S. <br /> I <br /> c P rogram Mana er <br /> Laurie A.Cotulla,R.E.H.S. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Fax: (209) 464-0138 Robert McClcllon.R.E.H.S. <br /> Program Manager Mark Barcellos,R.E.H.S. <br /> RAY BAGLIETTO & FRANK RAU2I <br /> FEB 15 2005 <br /> TULEBURGE WAREHOUSE <br /> 301 AURORA ST <br /> STOCKTON CA 95202 <br /> RE: SPEEDY FOOD MART <br /> 8200 N HWY 99 <br /> STOCKTON CA 95212 <br /> San Joaquin County Environmental Health Department (EHD) has been <br /> informed by City of Stockton Public Works that the Hammer Lane and ' <br /> Highway 99 interchange project will change the Highway 99 Frontage Road <br /> location. The southern portion of the above-referenced site is located within <br /> the footprint of the proposed roadway in the area where monitoring well <br /> Nff-2 is located. The work is projected to begin in March 2005. Therefore, 1 <br /> NIW-2 must be properly destroyed so it is not compromised by the <br /> construction work. <br /> A work plan to destroy MW-2, an EHD well destruction permit application, <br /> and $60 permit fee should be submitted by February 18, 2005, and the well <br /> destroyed by February 25, 2005. <br /> Donna H.eran, REHS, Director <br /> Environmental Health Department <br /> n / P <br /> effre Wong Senior REHS Margare Lagorio, REHS <br /> J Y g� <br /> LOP/Site Mitigation Unit IST Supervisor <br /> Cc: CRWQCB, Central '\Talley Region —James L.L. Barton, RG <br /> Cc: Ground Zero Analysis, Inc. —John P. Lane, RG <br /> Cc: San Joaquin County Deputy District Attorney — David Irey <br /> Cc: Freeman, D'Aiuto, Pierce, Gurev, Keeling & Wolf— Lee Roy Pierce,Jr.,JD, RIBA <br />