Laserfiche WebLink
Mr. Jeffrey Wong <br /> June 24, 2005 <br /> Page 3 of 3 <br /> The water produced during the pump test will be temporarily stored in a portable storage tank with a <br /> holding capacity of at least 3,600 gallons. Since the PDW has been tested quarterly for the presence <br /> of gasoline constituents and the results have been non-detect, all water produced during the test will <br /> be discharged to the adjacent field. However, the discharge rate will be limited to 5 gpm or less and <br /> the discharge Iocation will be periodically rotated within the field in order to prevent ponding on the <br /> ground surface. <br /> A technical report describing field activities and results will be submitted to EHD and the California <br /> Regional Water Quality Control Board(RWQCB). The report will include tabulated depth to water <br /> measurements of the PDW and the observation wells as well as evaluation of the data using the <br /> Jacob and/or the Theiss Method as appropriate. <br /> Please contact me at (209) 838-9888 if you have any questions or comments regarding this <br /> workplan. <br /> RespectfulIy, V-D G�G�O <br /> Ground Zero Analysis, Inc. ,. <br /> cc JOHN P. <br /> OPIE <br /> John P. Lane No. 6,795 r <br /> CA Registered Geologist No. 6795 <br /> Attachments --� <br /> cc: Mr. Ray Baglietto, Mr. Frank Rauzi <br /> Mr. James L.L. Barton, RWQCB <br /> Mr. David Irey, San Joaquin County Deputy District Attorney <br /> Mr. Lee Roy Pierce, Jr., Freeman, D'Aiuto, Pierce, Gurev, Keeling & Wolf. <br /> i <br /> i <br /> i <br /> I <br /> G:\GROUNDZE\TULEBURG\Repom\workplankWPpumptest—Tev2.doc <br /> I <br />