My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/28/2020 2:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> o °�'" Environmental Health Department DIRECTOR <br /> ). '�- �' .o Donna Heran,REHS <br /> 600 East Main Street <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> U): ��� ��' '� Robert McClellon,REHS <br /> • Jeff Carruesco,REHS,RDI <br /> Cgt.lx�¢��P <br /> Website: www.sjgov.org/ehd Kasey Foley,REHS <br /> Phone: (209)468-3420 <br /> Fax: (209)464-0138 <br /> .lune 15, 2010 <br /> Ray Baglietto & Frank Rauzi Ab Nawar <br /> Tuleburg WarehouseQ 8200 North Highway 99 <br /> 301 South Aurora Street V Stockton, CA 95212 <br /> Stockton, CA 95203 7JUN = <br /> RE: Speedy Food Mart <br /> 8200 North Highway 99r: <br /> Stockton, CA 95212 <br /> WORK PLAN: Groundwater Monitoring Well Destruction APPROVED: [X] <br /> DATED: June 9, 2010 DISAPPROVED: [ ] <br /> PREPARED BY: Ground Zero Analysis, Inc. <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10(c)(3)]: <br /> 1. Destruction by pressure grouting of nine groundwater monitoring wells and one groundwater <br /> extraction well. <br /> COMMENTS AND CONDITIONS: <br /> 1. Per California Well Standards Bulletin 74-90, after pressure grouting the upper five feet of <br /> the well casings shall be overdrilled and filled with native material. <br /> 2. Proceed with submittal of an EHD well destruction permit, required $60.00 permit fee and <br /> $345 inspection fee. <br /> 3. A report of findings must be submitted within 60 days following completion of all fieldwork. <br /> 4. Forty-eight hours notice to the EHD is required prior to all site fieldwork. <br /> Lori Duncan, REHS <br /> Senior Registered Environmental Health Specialist <br /> c: Jim Barton, CVRWQCB, 11020 Sun Center Drive#200, Rancho Cordova, CA 95670 <br /> Eric Price, Ground Zero Analysis, 1714 Main Street, Escalon, CA 95320 <br />
The URL can be used to link to this page
Your browser does not support the video tag.