Laserfiche WebLink
a <br /> Ms. Lori Duncan <br /> Page 2 of 2 <br /> downhole pump and associated wiring and piping will be removed. Monitoring well construction <br /> details are summarized in Table 1. The locations of the monitoring wells are shown on the site plan <br /> provided as Figure 2. <br /> You will be provided with at least 48-hours notice prior to conducting fieldwork. Please feel <br /> free to call me at (209) 838-9888 if you have any questions regarding this application. <br /> Respectfully, <br /> Ground Zero Analysis, Inc. <br /> j <br /> Joseph L. Vasquez, <br /> Staff Geologist <br /> Enclosures: Well Destruction Permit Application <br /> Check No. 019976 ($405.00) <br /> Attachments: EHD Correspondence <br /> i <br /> GAGROUNDMTULEBEMPermits&Applications\Well Dest Permit Cvr.doc <br />