Laserfiche WebLink
a <br /> Interim Groundwater Treatment System <br /> Operation._Maintenance. and Monitoring Manual <br /> manifold will be reconfigured to make the secondary unit the primary unit and the primary unit <br /> (having just experienced breakthrough) will be configured as the secondary unit. A carbon <br /> change-out will.be immediately scheduled. <br /> System Monitoring <br /> Routine monitoring will be conducted by Ground Zero personnel. in addition,the site operator will <br /> be trained to visually inspect the system for fluid leaks and/or accidental fluid release and <br /> emergency shut-down procedures. <br /> roeklo&mmani <br /> Pafre 2 <br />