My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/28/2020 2:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION PROCEDURES <br /> 11.INSTALLING THE PUMP(CONTINUED.) <br /> 4.Lower the pump into the well,Make sure the motor cable is not <br /> damaged when the pump is lifted or lowered into the well — <br /> especially in 3 inch wells. <br /> NOTE: Do not lower or lift the pump using the motor cable. <br /> 5. When the pump has been installed to the required depth,the <br /> installation should be finished by means of a well seal.Note that the dynamic <br /> water level should always be above the pump. <br /> b.Loosen the safety wire so that it becomes unloaded and lock it to <br /> the well seal using a cable clamp. <br /> 7. Attach the supplemental information label at the electrical <br /> installation site. <br /> S.Complete the electrical connections. <br /> Remember that a capacitor or a control box should NEVER be connected to a <br /> SQ/SQE submersible pump. <br /> Installation depths <br /> Maximum installation depth:below the static water level:500 feet, <br /> Minimum installation depths:1.75 feet below the dynamic water level: <br /> Vertical installation: <br /> During start-up and operation,the pump must always be <br /> completely submerged in water. <br /> Horizontal installation: <br /> The pump must be installed at least 1.75 feet below the <br /> dynamic water level.If there is a risk that the pump might be <br /> covered by mud,the pump must always be placed in a <br /> flow sleeve. <br /> Note:Do not lower or lift the pump with the motor cable. <br /> 12.Generator Operation <br /> It is safe to operate the SQ/SOE with a generator. <br /> The generator must be sized 50%above the pumps P1(input Power)values.See ' <br /> following chart. <br /> j1/3 <br /> j <br /> P Min.Generator Size(Watts) Recommended Generator <br /> Output(Watts) <br /> A 1100 1500 <br /> B 1700 2300 <br /> 1-11/2 C 2000 3500 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.