INSTALLATION PROCEDURES <br /> 11.INSTALLING THE PUMP(CONTINUED.) <br /> 4.Lower the pump into the well,Make sure the motor cable is not <br /> damaged when the pump is lifted or lowered into the well — <br /> especially in 3 inch wells. <br /> NOTE: Do not lower or lift the pump using the motor cable. <br /> 5. When the pump has been installed to the required depth,the <br /> installation should be finished by means of a well seal.Note that the dynamic <br /> water level should always be above the pump. <br /> b.Loosen the safety wire so that it becomes unloaded and lock it to <br /> the well seal using a cable clamp. <br /> 7. Attach the supplemental information label at the electrical <br /> installation site. <br /> S.Complete the electrical connections. <br /> Remember that a capacitor or a control box should NEVER be connected to a <br /> SQ/SQE submersible pump. <br /> Installation depths <br /> Maximum installation depth:below the static water level:500 feet, <br /> Minimum installation depths:1.75 feet below the dynamic water level: <br /> Vertical installation: <br /> During start-up and operation,the pump must always be <br /> completely submerged in water. <br /> Horizontal installation: <br /> The pump must be installed at least 1.75 feet below the <br /> dynamic water level.If there is a risk that the pump might be <br /> covered by mud,the pump must always be placed in a <br /> flow sleeve. <br /> Note:Do not lower or lift the pump with the motor cable. <br /> 12.Generator Operation <br /> It is safe to operate the SQ/SOE with a generator. <br /> The generator must be sized 50%above the pumps P1(input Power)values.See ' <br /> following chart. <br /> j1/3 <br /> j <br /> P Min.Generator Size(Watts) Recommended Generator <br /> Output(Watts) <br /> A 1100 1500 <br /> B 1700 2300 <br /> 1-11/2 C 2000 3500 <br /> 9 <br />