My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/28/2020 2:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br /> t <br /> INSTALLATION PROCEDURES <br /> 10. PIPING <br /> • The pump should only be gripped <br /> by the two flats at the top of the <br /> pump,as shown in Figure 10. <br /> t _ <br /> • The pump can be installed <br /> vertically or horizontally. During <br /> operation,the pump must always <br /> be completely submerged Figure 10 <br /> in water. <br /> • When plastic pipe is used,a stainless steel safety wire is recommended for <br /> lowering and lifting the pump.Fasten the wire to the eyelet on the pump, <br /> as shown in circle insert 2, Figure 11. <br /> • The threaded joints must be well <br /> cut and fit together tightly to <br /> ensure that they do not <br /> work loose. <br /> 11. INSTALLING THE PUMP <br /> Installation Depth <br /> The dynamic water level should A I <br /> always be above the pump.See fig. <br /> 11. � <br /> A= Dynamic water level <br /> B=Static Water Level <br /> C=Minimum 3 inch well diameter D <br /> D=Drawdown <br /> E= Installation depth below static <br /> water level.Maximum 500 feet <br /> Procedures <br /> To install the pump,follow j <br /> these steps: <br /> f 1. Install the enclosed data Insert 2 E <br /> plate sticker at the <br /> well head- <br /> 1 2.Check the well for proper <br /> clearance —the well Figure 11 <br /> must be at least 3inches in diameter.It is a good <br /> idea to check the well for clearance using a <br /> plumb ring(2.95 0 x 10 in.). <br /> 3.Attach the first section of riser pipe to the pump. <br /> C <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.