My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/28/2020 2:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> y <br /> OPERATING <br /> v <br /> I! <br /> Built-in protection <br /> The motor incorporates an electronic unit which protects the motor in <br /> various situations. G' <br /> In case of overload, the built-in overload protection will stop the pump ; <br /> for 5 minutes. After that period, the pump will attempt to restart. <br /> if the pump is started and the well has not recovered, the pump will stop i <br /> after 30 seconds. <br /> It theP ump has been stopped as a result of dry running, it will start <br /> automatically after 5 minutes. <br /> f <br /> Resetting the pump: <br /> Switch off the electricity supply for 1 minute. <br /> The motor is protected against the following conditions: <br /> - dry running, <br /> - voltage surges (up to 4000 V), <br /> t <br /> - overvoltage, f <br /> - undervoltage, <br /> - overload <br /> - over-temperature. <br /> MS 3 Motors: <br /> Note: All MS 3 motors are factory set to detect dry running conditions. <br /> However, it is important to ensure that the configurations of both the SQ <br /> pump and motor are the same configuration. Configurations can be <br /> found on both SQ pump and motor nameplates as"Config" <br /> EXAMPLE: Config.A-2, must match the other nameplate A-2. See <br /> Technical Data on page 17 for quick referencing on all configurations. <br /> MSE 3 Motors: <br /> Note: To set Dry-Run limit in the MSEISQE pumps, you need to <br /> connect the pump to a CU 300. Refer to CU 300 1&0 for proper <br /> connections. <br /> To set Dry-Run protection, follow these steps: <br /> 1. Start the pump against closed discharge. <br /> 2. Rapidly read the power consumption value (W) in the R100 # <br /> display 2.5. <br /> 3. Multiply this value by 0.9. <br /> 4.Within the R100, go to display 4.6 and enter the new value <br /> (minimum power limit). <br /> 5. Go to display 4.7 and change the setting to"Active". i <br /> For further information on dry-running, refer to CU 300 I&O. <br /> Maintenance and service: <br /> The pumps are normally maintenance-free. <br /> Deposits and wear may occur. For that purpose, service kits and service , <br /> tools are available from GRUNDFOS.The GRUNDFOS Service Manual <br /> is available on request. <br /> i The pumps can be serviced at a GRUNDFOS service center. <br /> i <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.