My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/28/2020 2:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19.ASSEMBLY OF PUMP AND MOTOR <br /> To assemble pump end and motor, proceed as follows: <br /> 1.Place the motor horizontally in a vice and tighten it, see Figure 12. <br /> i <br /> 2.Grease the motor shaft end with the grease supplied with the <br /> motor. <br /> 3.Screw the pump end on the motor.A spanner may be used on the <br /> clamping faces of the pump part, see Figure 12. <br /> 4.Install cable guard as described on page 7. <br /> When pump end and motor have been assembled correctly, there must not be <br /> a clearance between pump end and motor. <br /> To disassemble reverse procedure. <br /> i <br /> O <br /> Use pump vise here. <br /> sj I <br /> 2.91 inches, <br /> { 1.2 inches <br /> _ t <br /> T <br /> Figure 12 <br /> a <br /> 12 <br /> :I <br /> � I <br />
The URL can be used to link to this page
Your browser does not support the video tag.