My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005609
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
ARCHIVED REPORTS_XR0005609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:29 PM
Creation date
4/28/2020 2:07:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005609
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> GROUND ZERO ANALYSIS, INC. <br />' 1714 Maui Street <br /> Escalon, Cahfortna 95320-1927 <br /> Telephone (209)838-9888 <br /> Faesunile (209)838-9883 <br />' May 2, 2005 <br />' Mr Jeff Wong <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br />' Subject Quarterly Monitoring Report <br /> January through March 2005 <br /> Speedy Foods, 8200 N Highway 99, Morada, CA <br /> 1 <br /> Dear Mr Wong <br /> This letter report summarizes the first quarter 2005 groundwater monitoring, sampling, and <br /> remediation activities at the subject site Figure 1 presents a site vicinity map <br /> 1.0 SITE ACTIVITIES <br />' Activities at the site included operation and maintenance of the groundwater extraction and <br /> treatment system, conducting routine quarterly groundwater monitoring and sampling of site <br /> wells, analyzing groundwater and treatment system samples for constituents of concern, <br /> collecting groundwater samples from nearby domestic wells, installing a new vapor extraction <br /> well, and destroying groundwater monitoring well MW2 <br /> 1 <br /> 2.0 GROUNDWATER EXTRACTION AND TREATMENT SYSTEM <br /> 1 The groundwater extraction and treatment system operated for all or portions of 73 days during the <br /> reporting period With the authorization of the Regional Board, the air stripper was temporarily <br /> bypassed in early January and groundwater treatment was accomplished by pumping the water <br /> directly through the carbon units This was done because the air stripper's effluent pump failed <br /> The system operated in this fashion until January 10, 2005, when pumping was temporarily <br /> ' suspended in order to repair the effluent pump The system was restarted with the air stripper on- <br /> line on January 18, 2005 and operated with minimal down time through March 30, 2005 Periodic <br /> • maintenance included changing the particulate filters, repairing minor leaks at fittings, adjusting <br /> G 1GROUNDZEITULEBURGNReportslQMR000511QM2005 doc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.