My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005609
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
ARCHIVED REPORTS_XR0005609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:29 PM
Creation date
4/28/2020 2:07:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005609
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' Quarter Monitoring Report <br /> January through March 2005 <br /> . 8200 N Highway 99, Stockton, CA <br /> Page 2 of 8 <br />' system interlocks, and conducting an acid-wash through the system to remove accumulated hard- <br /> water scaling <br />' Automated Environmental Services performed a contractors assessment and adjusted the system <br /> interlocks on February 8, 2005 On February 17, the system began to develop problems with <br />' backpressure in the carbon units The excessive back-pressure was due to scaling within the valves <br /> and piping The system was shut down on February 24, 2005, and the carbon unit C2 was <br /> temporarily bypassed, pending treatment with an acid wash The system was restarted on February <br />' 25 and operated with one carbon unit until March 8, when the system was shut down and carbon <br /> unit C2 and the air stripper were both flushed with an acid/water solution to remove accumulated <br /> scale The system was restarted on March 9 but again developed back-pressure issues due to <br />' scaling Carbon unit C2 was again temporarily bypassed on March 18 due to scaling and the <br /> system was eventually shut down on March 30 due to greatly reduced flow Various venders have <br /> been, contacted regarding the scaling issue The treatment system is currently idle while Ground <br />' Zero is awaiting authorization from the Regional Board to install an automated metering pump to <br /> infect Aqua Mag, a blended phosphate, into the influent stream to minimize scaling Aqua Mag <br /> would be added at a design rate of approximately 0 I gallons per day No samples were collected <br />' from the treatment system in March, because high back-pressure triggered automatic shut-down of <br /> the system on the scheduled sampling day, March 30, 2005 <br />� . Approximately 264,943 gallons of water was treated during the reporting period (December 30, <br /> 2004 through March 30, 2005) at an average rate of 3 5 gpm during system operation, or <br /> approximately 2 0 gpm overall A total of approximately 819,916 gallons of groundwater were <br /> treated since groundwater extraction begain in November 2003 During that period, approximately <br /> 82 pounds of petroleum hydrocarbons, including approximately 25 pounds of MTBE, were <br /> removed through groundwater extraction and treatment No carcinogenic polynuclear aromatic <br /> hydrocarbons (PAHs)have been detected in any influent or effluent samples collected at the site In <br /> addition, the concentrations of inorganic constituents analyzed as part of WDRs issued for the site <br /> are below regulatory levels <br />' Treatments stem flow data and maintenance notes through March 30 2005 <br /> y gh are summarized in <br />' Table 1 Analytical results of samples collected from the treatment system are summarized in Table <br /> 2 The estimated mass removal is summarized in Table 3 Treatment system monitoring logs and <br /> laboratory reports are included in Attachments A and B, respectively <br /> I <br /> 3.0 QUARTERLY SITE WORK <br /> r3.1 Groundwater Elevation Measurements <br /> A Ground Zero technician monitored water levels in all site wells, and collected groundwater <br /> samples from monitoring wells MW3 through MW16, the vapor extraction well VW1, and the <br /> • groundwater extraction wells EW1 (MWI) and EW2 on March 16 and 17, 2005 No data was <br /> G 1GROUNUZEITULEBURGIReports\QMR1200511QM2005 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.