1 <br /> Quarter Monitoring Report <br />' January through March 2005 <br /> • 8200 N Highway 99, Stockton, CA <br /> Page 5 of 8 <br />' 4.0 ADDITIONAL SITE WORK <br />' 4.1 Vapor Well Installation <br /> On January 18, 2005, Ground Zero personnel supervised the drilling and installation of vapor <br />' extraction well VW2 The well was completed to a depth of approximately 47 feet below ground <br /> surface (bgs) The well was completed of 4-inch diameter, schedule 40 PVC casing The <br /> lowermost 25 feet of PVC casing installed in the well is slotted screen (0 10-inch slot size) The <br />' filter pack consists of pea gravel from the bottom of the well to approximately 2 feet above the <br /> slotted interval The annular seal consists of two feet of hydrated bentonite pellets at the top of the <br /> filter pack, then neat cement grout to the ground surface The well was completed with a grade <br />' level traffic rated well box and a locking well cap The well was installed by V&W Drilling, Inc <br /> (C57-720904) under the supervision of a Ground Zero geologist A Copy of the boring/well log is <br /> included in Attachment G Well locations including the new well VW2 can be seen on Figure 2 <br />' Soil samples were collected at 5-foot intervals for soil characterization and possible laboratory <br /> analysis Soil encountered consisted primarily of silty sand (SM) and sand with silt (SP-SM), <br />' although silt was encountered from approximately 8-10 feet and 20-30 feet bgs, and clay was <br /> encountered at the bottom of the borehole Groundwater was not encountered during drilling Soil <br /> • samples collected at depths of approximately 10 5 feet bgs, 15-45 feet bgs. (at 5-foot intervals), and <br /> 47 feet bgs (bottom of the hole) were submitted to Argon Laboratones for analysis of gasoline <br /> constituents <br /> Benzene was not detected in any of the soil samples collected from VW2 TPHg was detected in <br /> all samples collected at levels ranging from 2 7 parts per million(ppm.) in sample VW2-15 to 5,600 <br /> ppm in VW2-35 Ethylbenzene and xylenes were also detected in all soil samples collected <br /> MTBE was detected in all except samples collected, t for those at 10 5 and 20 feet bgs MTBE in the <br /> P P <br /> soil ranged from 0 14 ppm in VW2-15 to 14 ppm in VW2-45 Table 6 summarizes the analytical <br /> tresults of soil samples collected from well VW2 Copies of laboratory results are included in <br /> Attachment H <br /> 4.2 Well Destruction <br />' On February 28, 2005, a Ground Zero technician supervised the destruction of the <br /> groundwater monitoring well MW2 in response to a letter dated February 15, 2005, sent by <br /> EHD requesting well destruction Well destruction was requested because well MW2 <br /> infringes on the Highway 99 Interchange Protect being directed by CalTrans V&W Drilling <br /> (C57 License #720904) destroyed well MW2 under the supervision of Ground Zero personnel <br /> The well was destroyed by overdrilling with 8-inch diameter hollow stem augers to a total <br />' depth of 78 feet The borehole was then backfilled to the surface with neat cement grout <br /> Approximately 175 gallons of neat cement grout were used to fill the well borehole Figure 2 <br /> shows the locations of site wells <br /> GIGROUNDZEITULEBURG\Reports\QMR1200511QM2005 doc <br />