Laserfiche WebLink
e. A written commitment of manpower, equipment and materials to expeditiously remove any <br /> quantity of oil discharged that may be harmful. [If applicable, a copy of the contingency plan <br /> and any additional documentation will be attached to this Plan.] <br /> I certify that I have satisfied the requirements to implement a Plan under §112.3 and all of the <br /> requirements under §112.6(a). I certify that the information contained in this Plan is true. <br /> Signature: <br /> A.L. Powell Representative <br /> Name: Date: <br /> 1.3 Location of Plan <br /> This SPCC Plan is to be kept in the main administrative office at 23534 E Arthur Rd; Escalon, <br /> CA 95320 location; copies may be kept in locations convenient to petroleum storage locations. <br /> 1.4 Plan Review (40 CFR 112.3 and 112.5) <br /> 1.4.1 Changes in Facility Configuration <br /> In accordance with 40 CFR 112.5(a), A.L.Powell Trucking /ALPT Management periodically <br /> reviews and evaluates this SPCC Plan for any change in the facility design, construction, <br /> operation, or maintenance that materially affects the facility's potential for an oil discharge, <br /> including, but not limited to: <br /> commissioning of containers; <br /> reconstruction, replacement, or installation of piping systems; <br /> construction or demolition that might alter secondary containment structures; or <br /> changes of product or service, revisions to standard operation, modification of <br /> testing/inspection procedures, and use of new or modified industry standards or <br /> maintenance procedures. <br /> Amendments to the Plan made to address changes of this nature are referred to as technical <br /> amendments, and need not be certified by a PE. Non-technical amendments can be done (and <br /> must be documented in this section) by the facility owner and/or operator. Non-technical <br /> amendments include the following: <br /> change in the name or contact information (i.e., telephone numbers) of <br /> individuals responsible for the implementation of this Plan; or <br /> change in the name or contact information of spill response or cleanup <br /> contractors. <br /> A.L.Powell Trucking /ALPT MANAGEMENT must make the needed revisions to the SPCC <br /> Plan as soon as possible, but no later than six months after the change occurs. The Plan must <br /> be implemented as soon as possible following any technical amendment, but no later than six <br /> months from the date of the amendment. The Facility Manager is responsible for initiating and <br /> coordinating revisions to the SPCC Plan. <br /> 13 <br />