My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
601
>
2800 - Aboveground Petroleum Storage Program
>
PR0524262
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 2:53:05 PM
Creation date
4/28/2020 2:25:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0524262
PE
4740
FACILITY_ID
FA0016281
FACILITY_NAME
Old Dominion Freight Line - Stockton
STREET_NUMBER
601
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
Lathrop
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
601 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Statement of Owner/Operator <br /> 1 . 1 am familiar with the applicable requirements of 40 CFR part 112; <br /> 2. 1 have visited and examined the facility; I am aware of deficiencies outlined in the enclosed <br /> Notice of Violation dated August of 2018 and the ongoing fees to be assessed by the county of <br /> San Joaquin for these deficiencies. <br /> 3. This plan was prepared in accordance with accepted and sound industry practices and <br /> standards; <br /> 4. Procedures for required inspections and testing have been established in accordance with <br /> industry inspection and testing standards or recommended practices; <br /> 5. 1 will fully implement the plan; <br /> 6. This facility meets the following qualification criteria {under §112.3(g)(1)}; <br /> a. The aggregate aboveground oil storage capacity of the facility is 10,000 U.S. <br /> gallons or more; and <br /> b. The facility has had no single discharge as described in §112.1 (b) exceeding <br /> 1 ,000 U.S. gallons and no two discharges that as described in §112.1 (b) each <br /> exceeding 42 U.S. gallons within any twelve month period in the three years prior <br /> to an SPCC Plan self-certification date, or since becoming subject to 40 CFR part <br /> 112 if the facility has been in operation for less than three years (not including oil <br /> discharges as described in §112.1 (b) that are the result of natural disasters, acts <br /> of war, or terrorism); and <br /> c. There is at least one individual oil storage container at the facility with an <br /> aboveground capacity of greater than 5,000 U.S. gallons. <br /> 7. This Plan does not deviate from any requirement of 40 CFR part 112 as allowed by <br /> §112.7(a)(2) (environmental equivalence) and §112.7(d) (impracticability of secondary <br /> containment) or include an exemption/measures pursuant to §112.9(c)(6) for produced water <br /> containers and any associated piping and appurtenances downstream from the container. <br /> 8. This Plan and individual(s) responsible for implementing this Plan have the full approval of <br /> management and I have committed the necessary resources to fully implement this Plan as <br /> required by 40 CFR112.6(a)(1). <br /> I also understand my other obligations relating to the storage of oil at this facility, <br /> including, among others; <br /> 1 . To report a discharge to navigable waters or adjoining shorelines to the appropriate <br /> authorities. Notification information is included in the Plan; <br /> 2. To review and amend this Plan whenever there is a material change at the facility that <br /> affects the potential for an oil discharge, and at least once every five years. Reviews and <br /> amendments are recorded in an attached log <br /> 3. Optional use of a contingency plan. A contingency plan: <br /> a. May be used in lieu of secondary containment for qualified oil-filled operational equipment, <br /> in accordance with the requirements under §112.7(k), and; <br /> b. Must be prepared for flowlines and/or intra-facility gathering lines which do not have <br /> secondary containment at an oil production facility, and; <br /> c. Must include an established and documented inspection or monitoring program; and <br /> d. An oil spill contingency plan following the provisions of 40 CFR part 109; and <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.