My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
601
>
2800 - Aboveground Petroleum Storage Program
>
PR0524262
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 2:53:05 PM
Creation date
4/28/2020 2:25:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0524262
PE
4740
FACILITY_ID
FA0016281
FACILITY_NAME
Old Dominion Freight Line - Stockton
STREET_NUMBER
601
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
Lathrop
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
601 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4-2 summarizes inspections and tests performed on bulk storage containers <br /> ("EE" indicates that an environmentally equivalent measure is implemented in place of <br /> the inspection/test, as discussed in Section 3.1 of this Plan). <br /> Table 4-2: Scope and Frequency of Bulk Storage Containers Inspections and Tests <br /> Tank ID <br /> Inspection/Test Enclosure Rear USTs Drums <br /> Yard <br /> Visual inspection by facility M M M M <br /> personnel (as per checklist of A A A A <br /> Appendix C) <br /> External inspection by certified 5 yr EE EE <br /> inspector (as per STI Standard <br /> SP-001) <br /> Internal inspection by certified t EE <br /> inspector (as per STI Standard <br /> SP-001) <br /> Tank tightness test meeting n/a <br /> requirements of 40 CFR 280 <br /> Legend: M: Monthly <br /> A: Annual <br /> EE: Inspection not required given use of environmentally equivalent measure (refer to Section 3.1 <br /> of this Plan). <br /> Or earlier, as recommended by the certified inspector based on findings from an external <br /> inspection. <br /> t Internal inspection may be recommended by the certified inspector based on findings from the <br /> external inspection. <br /> The frequency above is based on implementation of a scheduled inspection/testing <br /> program. To initiate the program, ASTs will be inspected by the following dates: <br /> All ASTs should be scheduled <br /> USTs, if any are installed, are to be regularly tested <br /> 4.4.3 Heating Coils (40 CFR 112.8(c)(7)) <br /> There are no heating coils as this location is in a temperate zone. <br /> 4.5 Overfill Prevention Systems (40 CFR 112.8(c)(8)) <br /> All tanks in the fuel yard are equipped with manual leak-detectors. Partial secondary <br /> containment is provided in the event of overfills, as described in this Plan. <br /> This facility does not use any 55 gallon storage drums to contain any petroleum product <br /> Facility personnel are able to monitor product levels throughout the filling operations via the <br /> manual leak-detector system which measures the product level in the tanks. <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.