My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
601
>
2800 - Aboveground Petroleum Storage Program
>
PR0524262
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 2:53:05 PM
Creation date
4/28/2020 2:25:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0524262
PE
4740
FACILITY_ID
FA0016281
FACILITY_NAME
Old Dominion Freight Line - Stockton
STREET_NUMBER
601
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
Lathrop
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
601 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br /> Purpose <br /> The purpose of this Spill Prevention, Control, and Countermeasure (SPCC) Plan is to <br /> describe measures implemented by A.L.Powell Trucking (also described in this SPCC <br /> plan as ALPT ) to prevent oil discharges from occurring, and to prepare A.L.Powell Trucking <br /> to respond in a safe, effective, and timely manner to mitigate the impacts of a discharge. <br /> This Plan has been prepared to meet the requirements of Title 40, Code of Federal <br /> Regulations, Part 112 (40 CFR part 112), CA APSA, and supersedes the earlier Plan <br /> developed to meet provisions in effect since 1974. <br /> In addition to fulfilling requirements of 40 CFR part 112, this SPCC Plan is used as a <br /> reference for oil storage information and testing records, as a tool to communicate practices on <br /> preventing and responding to discharges with employees, as a guide to facility inspections, <br /> and as a resource during emergency response and a template for personnel training for all <br /> employees who operate or handle petroleum products onsite. <br /> A.L.Powell Trucking management has determined that this facility does not pose a <br /> risk of substantial harm under 40 CFR part 112, as recorded in the "Substantial Harm <br /> Determination" included in Appendix B of this Plan. <br /> This Plan provides guidance on key actions that must be performed to comply with the <br /> SPCC rule and appropriate local guidelines- <br /> -]Complete monthly and annual site inspections as outlined in the Inspection, Tests, and <br /> Records section of this Plan (Section 3.7) using the inspection checklists included . <br /> -]Perform preventive maintenance of equipment, secondary containment systems, and <br /> discharge prevention systems described in this Plan as needed to keep them in proper <br /> operating conditions. <br /> :]Conduct annual employee training as outlined in the Personnel, Training, and Spill <br /> Prevention Procedures section of this Plan (Section 3.8) and document them on the log <br /> included in Appendix E. <br /> []If either of the following occurs, submit the SPCC Plan to the EPA Region 9 Regional <br /> Administrator (RA) and the California Dept of Water Resources (CADWR) and Office of State <br /> Fire Marshal (OSFM), along with other information as detailed in Section 5.4 of this Plan- <br /> -The facility discharges more than 1 ,000 gallons of oil into or upon the navigable waters of the <br /> U.S. or adjoining shorelines in a single spill event; or <br /> []The facility discharges oil in quantity greater than 42 gallons in each of two spill events within <br /> any 12-month period. <br /> []Review the SPCC Plan at least once every three (3) years and amend it to include more <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.