My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012727
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
9474
>
3500 - Local Oversight Program
>
PR0545623
>
ARCHIVED REPORTS_XR0012727
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:34 PM
Creation date
4/28/2020 4:27:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012727
RECORD_ID
PR0545623
PE
3528
FACILITY_ID
FA0004968
FACILITY_NAME
CHEVRON 96155 (INACT)
STREET_NUMBER
9474
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
08515003
CURRENT_STATUS
02
SITE_LOCATION
9474 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> 4 Chevron U.S.A. <br /> Page 20 <br /> On this date,the backfill operation war within approximateIv three feet of the <br /> t final grade. Dames&Moore indicated to California Petroleum that,once the <br /> backfilling was complete,the site was to be graded so that surface drainage would be <br /> conveyed towards the frontage road to the west, to minimize any possibility of <br /> drainage toward residences on the east. <br /> F t� <br /> �s <br /> On October 30, 1990,Mr. Michael Erwin of Dames&Moore met with Mr.Harlan <br /> Knolls at the site for a final inspection. The San Joaquin County Health Department <br /> was satisfied with the condition and final grade of the site. <br /> 1_y 5.3 Backfill and Compaction <br /> r <br /> Soil aerated during the remediation process was replaced in the pit as compacted <br /> iA fill beginning on October 19, 1990.Fills were placed using a vibratory sheepsfoot <br /> roller. The bottom photograph on Plate 2 shows the compaction effort in progress. <br /> { Compaction testing of the fill was performed by Twining Laboratories of Modesto, <br /> California. Specifications for compaction called for a minimum of 90%relative <br /> compaction based on the ASTM D-1557-78 test method for moisture content/density <br /> i relationship. Fills were tested at a maximum interval of 2 vertical feet. A copy of <br /> _ Twining Laboratory's report is included in Appendix B. <br /> , �.6oaa-zsa-a,a <br /> In <br /> C3_�a:es & A400m, <br />
The URL can be used to link to this page
Your browser does not support the video tag.