1 <br /> . GEOLOGIC CONTROL <br /> Splits of all samples will be logged for geologic and <br /> hydrologic character under the Unified Sail Classification system <br /> and U.S. Bureau of Mines rock color chart . A continuous geologic <br /> log of cuttings will be made as they come off the soil boring <br /> auger . These logs will be plotted as graphic and descriptive logs <br /> at a scale of 1 inch equal to 10 feet . <br /> QUALITY CONTROL <br /> ' All sampling equipment and tools will be decontaminated on <br /> site before each boring and rinsate contained in visqueen ponds <br /> for evaporation or disposal . All sample collection devices will <br /> ' be steam cleaned or washed in Tri Sodium Phosphate and double <br /> rinsed in clean water . If there is vapor detectable levels of <br /> contamination in the rinsate the rinsate will be contained in DOT <br /> 55 gallon drums and manifested to a hazardous waste disposal <br /> ' facility. If no detectable contamination exists in the rinsate <br /> then the rinsate will be allowed to evaporate and the residue <br /> transported with the contaminated soil to a HWMU. <br /> ' Duplicate (bottom and middle tube in the spit spoon sample) <br /> samples will be taken at 10 foot depth in soil boring 1 and 15 <br /> foot depth in soil boring 2. In addition 1 trip blank will be run <br /> for every 20 samples (5%) and one field blank before the last <br /> sample on every sampling day in which more than one boring is <br /> completed . This check sampling is in addition to the lab method <br /> blanks and surrogate sampling . <br /> MONITOR WELL CONSTRUCTION <br /> Should soil borings be converted into monitoring wells they <br /> will be constructed in accordance with LUFT guidelines. The <br /> included diagrams show the specifics of typical well to be <br /> ' constructed in isolated or traffic areas. <br /> The monitoring wells will be used as piezometer and initial <br /> water sample collection wells unless a formal monitoring schedule <br /> is required . The screen intervals will be 15 feet unless <br /> ' confining zones are encountered within the proposed screen <br /> interval . In this case screen intervals will be reduced to 5 feet <br /> with three feet being below and two feet above the water table. <br /> As with the soil borings the drill cuttings from the well <br /> construction will be screened with an OVA and containerized in <br /> DOT drums for appropriate disposal later . <br /> ' PROJECT TIME FRAME <br /> The historical review should take about 1 day to complete . <br /> ' The first round of soil borings should be completed in two days <br /> • if the borings are not converted to wells. <br /> ' S <br /> ' T & T EARTH SERVICES <br />