My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/29/2020 12:50:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKPLAN ADDENDUM_ <br /> T & T TRUCKING <br /> August 7, 1995 <br /> WKA No. 3001.01 <br /> Page 2 <br /> I <br /> The excavated contaminated soils will be stockpiled in the rear of the site on plastic and covered <br /> with plastic. -One composite sample consisting of four brass tubes for every <br /> 50 cubic yards of <br /> stockpiled contaminated soil will be collected by excavating one to two feet below the surface of <br /> the stockpile and driving clean, two-inch diameter, six-inch long brass tubes into the soil using a <br /> rubber mallet. The samples will be sealed and submitted to a California-certified laboratory as <br /> previously described and tested for TPH as gasoline and BTEX. <br /> Upon completion of excavation activities and approval from San Joaquin County, the upper eight <br /> feet of clean overburden soil removed during excavation wackfilled into the existing <br /> excavation, along with additional clean fill material and uniform) compacted to at least 90% <br /> _ Y <br /> relative compaction as referenced to ASTM D1557. <br /> Subsequent to field investigation, the data generated will be evaluated and a report prepared that <br /> will include: <br /> ' a site plan showing sample locations and extent of excavation <br /> P P <br /> • description of soils encountered during excavation using the Unified Soils <br /> Classification System <br /> • laboratory test results with chain-of-custody documents <br /> • conclusions regarding the nature of soil contamination <br /> The field investigation will begin within two weeks from the time San Joaquin County approves <br /> this workplan. The report of findings will be completed within three to four weeks from the time <br /> the field work is 'completed. <br /> Wallace Kuhl & Associates, Inc. - <br /> Richard Premzic <br /> Registered Geologist #5586 <br /> RP:sdm <br /> Attachments <br /> RW3001.0F.,pl <br /> WALLACE•KUHL <br /> Recycled paper S AssocimEs INC. <br /> 3 <br /> z <br />
The URL can be used to link to this page
Your browser does not support the video tag.