My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005706
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
ARCHIVED REPORTS_XR0005706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:32 PM
Creation date
4/29/2020 1:19:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005706
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' Mr Michael Infurna <br /> July 14, 2005 <br /> ' Page 5 <br /> SVE and AS Pilot Test The SVE and AS pilot tests will be completed as <br /> described in the standard operating procedures provided in Appendix B <br /> ' Health and Safety. All field work conducted will be done in compliance with the <br /> Code of Federal Regulations (CFR) 1910 120 Appendix C presents the site <br /> specific health and safety plan for this site <br /> Surveying BC will subcontract with a Cahfornia-licensed land surveyor to <br /> provide Z, Y, Z coordinates for each extraction well The coordinates will be <br /> collected in a manner that complies with GeoTracker and applicable groundwater- <br /> monitoring and reporting requirements <br /> ' <br /> Project Schedule and Dehverables The field work as discussed above will <br /> require approximately four months to complete This time frame includes <br /> installation of two SVE wells, connecting the SVE and AS systems, and <br /> completion of the pilot test Field work will be scheduled upon receiving written <br /> approval of the work pian from San Joaquin County <br /> M The results of the well installation and SVE and AS pilot tests will be summarized <br /> in a letter report that will be completed approximately four weeks after receiving <br /> the final laboratory results The letter report will include a brief description of the <br />' work, results of the pilot test, a tabular summary of the analytical results, survey <br /> results, how the test was conducted, how the results were used in determining a <br /> capture zone, a graphical representation of the capture zone, and how the results <br />' of the test are used to determine parameters necessary for the design and <br /> implementation of a permanent remediation system <br />' If you have any questions or comments, please call me at (91 G) 853-5316 <br /> Sincerely, <br /> QED GEO <br /> BROWN AND C <br />' No. 8893 <br /> Tina M Bauer P <br />' <br /> Project Manager -1 Q <br /> OF <br />' CF ds <br /> Enclosures <br /> cc Mr Terry Tarditi,T&T Trucking, Inc <br />' P\28000\128253- 1&1 I ruekjng SVI'\Work Plan 9%e doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.