My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012960
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
ARCHIVED REPORTS_XR0012960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:34 PM
Creation date
4/29/2020 1:19:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012960
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Ronald Rowe <br /> } <br /> May 25, 1999 " f <br /> Page 4 <br /> Over-Excavation <br /> Upon review and evaluation of soil sampling results PHS/EHD may require additional <br /> over excavation. If additional over excavation is required by PHS/EHD, appropriate M <br /> permits will be obtained. A backhoe will be brought back on site to remove impacted soil <br /> under the direction of PHS/EHD. Additional samples will be collected within the <br /> excavation under the same protocols as described in Exhibit C. Excavated material will be <br /> segregated from the existed two stockpiles and sampled accordingly. <br /> M <br /> A Site Safety and Health Plan (SSHP), dated January 8, 1998, has been prepared for this site <br /> and will be followed and retained on-site during the field work performed by BC. <br /> Project Schedule <br /> Itis anticipated the fieldwork will be completed in approximately one to two weeks. This <br /> schedule is contingent upon review time of analytical results by PHS/EHD, PHS/EHD <br /> availability, equipment availability, and any additional over excavation events. <br /> x <br /> A summary report in letter form will be submitted to PHS/EHD approximately six weeks <br /> after the field work is complete. The report will include a description of field methods, <br /> results of laboratory analysis of soil, and conclusions. <br /> If you have questions or comments, please call me at (916) 444-0123: <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> Tina M. Bauer I <br /> i <br /> Project Manager ►1 <br /> TMB:jw <br /> F cc: Mr. Terry Tarditi, T&T Trucking <br /> f <br /> i <br /> j Use or disclosure of data continued on this sheet is subject to the restriction specified at the beginning of this document �y <br /> BCSA CO I\P:\16000\16731\WR KPLN3.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.