Laserfiche WebLink
TAI3�E_4d:S9�YT.�y� <br /> 1.0 INTRODUCTION <br /> 1.1 Purpose I <br /> 14 <br /> 11 Scope or work 1 <br /> 1 <br /> 2,0 PREVIOUS WORK <br /> 2.1 Soil Porings 3 <br /> 2.2 Monitoring Wells 3 <br /> 3.0 BACKGROUND INFORMATION 6 <br /> 3.1 Site Setting 6 <br /> 3.2 Site History 6 <br /> 3.3 Spillllistory 6 <br /> 3.4 Well Inventory 9 <br /> 3.5 Utilities 9 <br /> 3.6 RrLional Geology 9 <br /> 3.7 Site Geology 9 <br /> 3.8 Ground Water Flow I I <br /> 11 <br /> 4.0 PROPOSED SOIL BORING AND MONITOR WELL <br /> 4.1 Boring/Monitoring Well 11 <br /> 4.2 Soil Sample Collection and Screening I I <br /> 4.3 Monitoring Weil Installation 12 <br /> 4.4 Chemical Analysis 12 <br /> 4.4.1 Soil Chemical Analysis 12 <br /> 4.4,2 Ground Water Chemical Analyses 12 <br /> 5.0 SCHEDULE !4 <br /> 14 <br /> 6,0 REMARKS/SIGNATURES <br /> 15 <br /> iawu <br /> TABLE I Soil Chemistry Results <br /> TABLE 2 Ground Water Chemistry Results 4 <br /> TABLE 3 Tank Information 7 <br /> TABLE 4 Generalized Stratigraphic Column or San Joaquin County Ip <br /> t'1t'-ures <br /> FIGURE I Site Location <br /> FIGURE 2 Site Map 2 <br /> FIGURE 3 Typical Monitoring-Well Construction Spcciffcations 5 <br /> 13 <br /> ADr)end w <br /> APPENDIX A During Logs and Monitoring Well Construction Diagrams <br /> APPENDIX B Laboratory Reports <br /> APPENDIX C Methods, Analytical Procedures, Quality Assurance Plan, <br /> and Site Safety Plan <br /> 1� <br />