Laserfiche WebLink
' 31 March 2005 <br /> AGE-NC Project No 03-1080 <br />' Page 3 of 7 <br /> MW-3, 3 2 µg/1 1,2-DCA and 5 6 µg11 MTBE were detected in ground water samples from <br /> monitoring well MW-4, and 5 1 4g/1 MTBE were detected in well MW-8 A summary of historical <br /> ground water analytical data is provided in Appendix B <br /> ! On 29 August 1997, four confirmation soil borings(VB-1 through VB-4)were advanced on-site to <br /> 25 feet bsg Eight soil samples were analyzed, one of the soil samples, taken at 25 feet bsg <br /> (VB-2-25), detected 0 0017 milligrams per kilogram (mg/kg) 1,2-DCA A table summarizing <br /> confirmation soil boring analytical results is provided in Appendix C <br /> 5 <br /> ' On 29 December 1998, a no further action letter was issued for the site by the EHD <br /> In a letter dated 31 December 1998,Apex reported that all on-and off-site ground water monitoring <br /> wells MW-1 through MW-9 had been abandoned, and the remediation system and compound <br /> dismantled The approximate locations of former monitoring wells MW-1 through MW-9 and <br /> confirmation borings VB-1 through VB-4 are illustrated on Figure 2 <br /> ' In January 2003,AGE was present at the site during the UST system dispenser and piping excavation <br /> and upgrade activities,performed by Elite IV Contractors,Inc of Stockton,California Soil removed <br /> ' during the excavation was stockpiled on-site for characterization for soil disposal Soil samples were <br /> collected for laboratory analysis from the floor of the fuel dispenser and piping excavations, from <br /> a gravel pile, and from the soil stockpiles The laboratory analysis detected TPH-g and TPH-d, as <br /> ' well as volatile aromatic compounds ethylbenzene and xylenes in the sample collected from <br /> dispenser D 1,TPH-d,toluene,and xylenes were also detected in the D4 sample In addition,the fuel <br /> additives MTBE and tertiary butanol(TBA)were detected in the sample collected from soil stockpile <br /> IA-IB The excavated soil was subsequently transported to Forward Landfill for disposal Analytical <br /> results are summarized in Table 3 <br /> r <br /> 3.0. PROCEDURES <br /> The field work reported herein was performed in accordance with procedures outlined in the AGE- <br /> prepared Revised Preliminary Site Assessment Work Plan, dated 18 November 2003 and approved - <br /> ' by the EHD in a letter dated 01 July 2004 <br /> ' 31 DRILLING ` <br /> On 02 and 03 August 2004, three soil probe borings (BI through 133) were advanced at the site <br /> utilizing a van-mounted Geoprobe 5400 direct-push probing unit equipped with 1 25-inch probing <br /> is rods Boring B 1 was advanced to a depth of 40 feet bsg,borings B2 and B3 were advanced to a depth <br /> 5 _ <br /> I <br /> Advanced GeoEwonmental,Inc <br /> 1 <br />