Laserfiche WebLink
Two containment areas were constructed at the northwest corner of the site. The south <br /> containment area ("Al" on attached diagram) was utilized for drum and debris storage. <br /> The north containment area ("B1" on attached diagram) was used to store soil and <br /> debris. In June 1994 it became necessary to move the two containment areas to the <br /> south end of the project to make room for soil and debris that had been excavated from <br /> the trench. The two new containment areas ("A2" & "B2" on attached diagram) were <br /> constructed to the same specifications as the original containment areas, "A1" & "B1". <br /> Soil was placed in the north containment area "132", and drums and debris were placed <br /> in the south containment area "A2". <br /> 4 <br /> I; <br />