My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
3200
>
2200 - Hazardous Waste Program
>
PR0220097
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:10:04 PM
Creation date
5/1/2020 11:25:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220097
PE
2227
FACILITY_ID
FA0001783
FACILITY_NAME
HOLMAN INVESTORS LLC
STREET_NUMBER
3200
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95212
APN
12202019
CURRENT_STATUS
02
SITE_LOCATION
3200 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AN <br /> 4. Do you use a "first in, first ✓ Using materials in a "first in, first out" order can <br /> out" materials usage policy? prevent stock from becoming obsolete and a <br /> a � <br /> /_ Yes N o c hazardous waste. You can easily rotate and <br /> maintain your stock by labeling, dating, and <br /> r S inspecting new material containers as they are <br /> received. Then, use the earliest labeled stock. <br /> � <br /> S. Do you purchase only ✓ <br /> enough raw materials and Having a minimum supply of raw materials can <br /> prevent accumulation and eliminate large <br /> perishable hazardous amounts of excess materials which may not be <br /> materials that will be used used at a later date. Also, overstock of perishable <br /> before they become materials can cont rib�to to hazardous wa te. <br /> outdated? <br /> i S S D CC'.r i J �j ys.L,- <br /> Yes -r N Q <br /> j�X4Y 4U '� -^ C,,) <br /> 6. Are material balances Performing c-amu V�N�..e �.&-cX� <br /> ✓ a material balance for critical. J <br /> performed forthe critical processes will allow you to ensure the efficiency C4��' <br /> processes your site? of production as well as optimize your source <br /> 7 Yes -' No reduction efforts by knowing the raw materials <br /> entering and the products and wastes leaving your <br /> processes. <br /> 7. Are material inventories ✓ Computerizing your inventory will allow you to <br /> computerized? Do you track keep track of the materials you use and how much <br /> the usage of raw materials? is remaining. This will allow you to keep the <br /> =i Yes 7 No material levels at a point where you use up your <br /> materials just as new materials are arriving. <br /> Personal computers that allow you to computerize <br /> your inventory are relatively inexpensive. <br /> l& m frc�cic rL car , i r c, r �a <br /> I. Are hazardous materials ►/ Covering individual containers can <br /> stored in covered prevent <br /> containers? evaporation, contamination by foreign particles, <br /> and the frequency of spills. <br /> Yes --- No <br />
The URL can be used to link to this page
Your browser does not support the video tag.