Laserfiche WebLink
K. R. (KEN) WELCH <br />Assistant Vice President <br />Environmental Management <br />Mailing Address: <br />Room 930 <br />1416 Dodge Street <br />Omaha, Nebraska 68179 <br />Fax No. (402) 271-4461 <br />Mr. Doug Wilson <br />Supervising R.E.H.S. <br />Environmental Health <br />San Joaquin County <br />445 N. San Joaquin St <br />Stockton, CA 95201 <br />Dear Mr. Wilson: <br />UNION PACIFIC RAILROAD COMPANY <br />ivision <br />iw <br />March 28, 1995 <br />File: Environmental Protection <br />California, Stockton <br />S. W. (STEVE) BERKI <br />Director -Environmental Operations - <br />Central <br />G. A. (AVERY) GRIMES <br />Director -Environmental Operations - <br />Western <br />L. A. (LANNY) SCHMID <br />Director -Environmental Operations - <br />Southern <br />R. L. (RICK) EADES <br />Director -Environmental Site Remediation <br />N. D. (NORM) SILER <br />Director -Environmental Technologies <br />APR 0 3 1995 <br />ENVIRONMENTAL HEALTH <br />PERMIT/SERVICES <br />The Un on Pacific Railroad would like to address and close out the Stockton, <br />California "Hazardous Waste Inspection Report" dated December 29, 1994, specifically <br />Violations #1, 3, 5, 20 46 and 49. the following in an outline of the violations and corrections. <br />Violation #1 -5244.4 (HSC) Failed to submit a report to the Department at least every <br />two years. <br />In March of 19' <br />for submission of the 1 <br />this report, thus, in Me <br />submitted to the EPA c <br />violation. The 2 repos <br />and ca be reviewed <br />Violation #3 - <br />Below is an out <br />past year which will de <br />to SB -l4. <br />On October 6, <br />minimization training a <br />meeting. At this meeti <br />well as elect the Team <br />dates/time/agenda. Cu <br />the California department of Toxic Substances cancelled their request <br />13 Hazardous Waste Report. The U.S. EPA did not cancel submission of <br />h of 1994 reports were submitted to the U.S. EPA. The reports <br />Itain Form GM's which will suffice as the report requested in this <br />missing at the site during the inspection are now currently on site <br />any time at the Stockton Facility. <br />21 (HSC) Failed to retain current (SB -14) review and plan. <br />ine of activities that have taken place at the Stockton Facility during the <br />cribe the Union Pacific Railroad's commitment and direction with regards <br />994 employees from the Stockton Facility met in Sacramento for waste <br />:id their first Waste Minimization Quality Improvement Team (QIT) <br />ig the team began to draw up process flow diagrams for the facility, as <br />.eader, identified Team Members and scheduled the next few meeting <br />rently, the QIT consists of a 9 member team which represents all <br />