Laserfiche WebLink
The following is an <br />have not been adds <br />Violation #201 — Plan <br />The Professional Engir <br />on completion of amen <br />containment. The PE <br />attesting that the PE is <br />facility, the Spill Prever <br />accordance with good <br />procedures have been <br />facility. Immediately of <br />completed certification <br />itemized list of aboveground petroleum storage act violations that <br />essed for UNION PACIFIC RAILROAD - Stockton as of <br />September 28, 2016. <br />Violation #612 — Failec <br />to prevent discharge. <br />Two mobile refueler truc <br />plan states, "one of the <br />southeast of the Locom <br />containment for the larg <br />and/or diversionary stru <br />including walls and floor <br />from a primary containn <br />Immediately provide ads <br />larger than 55 gallons. <br />Violation #514 — Failed <br />capable of containing c <br />The two 6,000 gallon fue <br />secondary containment. <br />equipment to prevent a c <br />capable of containing oil <br />system will not escape tl' <br />secondary containment f <br />Open violations from January 12, 2016 inspection <br />ertification by a Professional Engineer (PE) missing or incomplete. <br />er (PE) certification is incomplete. The SPCC plan certification was dependant <br />rents, including replacing damaged tank gauges and installing secondary <br />!rtification must include all of the aspects in 40 CFR 112.3(d)(1), including <br />amiliar with 40 CFR Part 112, he or his agent has visited and examined the <br />on, Control, and Countermeasure (SPCC) Plan has been prepared in <br />igineering practice, including consideration of applicable industry standards, <br />stablished for required inspections and testing, and the Plan is adequate for the <br />Sin a complete PE certification for the facility's SPCC Plan. Submit a copy of the <br />r the EHD. <br />to provide secondary containment, diversionary structures, or equipment <br />s were observed parked in the northeast corner of the parking lot. The SPCC <br />TL trucks is parked full and unattended in the northeast corner of the parking lot <br />ive Shop. This location does not provide adequate passive general secondary <br />st compartment of the truck." A facility shall provide appropriate containment <br />ures or equipment to prevent a discharge. The entire containment system, <br />must be capable of containing oil and must be constructed so that any discharge <br />int system will not escape the containment system before cleanup occurs. <br />luate secondary containment for all aboveground petroleum storage containers <br />Open violations from August 20, 2012 inspection <br />to provide secondary containment and/or diversionary structures that are <br />ischarge from primary containment until it is cleaned up. <br />ing trucks are parked in the main parking lot for the facility and do not have <br />A facility shall provide appropriate containment and/or diversionary structures or <br />ischarge. The entire containment system, including walls and floor, must be <br />snd must be constructed so that any discharge from a primary containment <br />e containment system before cleanup occurs. Immediately provide adequate <br />)r all aboveground petroleum storage containers larger than 55 gallons. <br />Page 5 of 5 <br />