Laserfiche WebLink
Item #104: <br />Union Pacific directs <br />Center (RMCC). The <br />professionals that hay <br />authorities, as approp <br />This infrastructure is L <br />within an infrastru <br />authorities, including <br />DECEIVED <br />FEB 1 1 2016 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />II emergency communications through its Response Management Communications <br />RMCC is staffed 24 hours per day, seven days per week with communication <br />been trained to notify relevant federal, state and local emergency response <br />date, and to dispatch the Railroad's emergency response resources as necessary. <br />lilized throughout the Railroad's system, which encompasses hundreds of facilities <br />of 32,000 miles in 23 states. It is also sanctioned by federal, state and local <br />lost jurisdictions within the State of California. To the extent that the Railroad's <br />system deviates fromhe explicit wording of the local requirement, we believe it accomplishes the <br />objective of the local r quirement in a way that provides consistentcy throughout the Railroad's 32,000 <br />mile infrastructure; an to the extent the local requirement is inconsistent, we believe it is preempted by <br />the Interstate Comme e Termination Act of 1995, 49 U.S.C. 10501. This exercise of federal preemption <br />authority does not mee n Union Pacific will violate state and local requirements that are designed to <br />protect human health E nd the environment. It simply means that an alternative method will be utilized to <br />meet those requiremer is in a way that does not burden interstate commerce. <br />Item #109: <br />Manifests 012422085J K, 012423729JJK and 010192669JJK were re -submitted by GHD Associates to <br />DTSC, on behalf of Un on Pacific. Copies of the final manifests are included as Attachment 6. <br />Item #110: <br />Manifests 0124220851 K, 012423729JJK and 010192669JJK were re -submitted by GHD Associates to <br />DTSC, on behalf of Uni n Pacific. Copies of the final manifests are included as Attachment 6. <br />Item #301. <br />On January 21, 2016, t e oil observed to be leaking from the air compressor was sampled and a waste <br />determination was corn feted by Union Pacific contractor Arcadis (Attachment 7). The oily material from <br />the compressor unit wa sampled and has been determined to be a non -hazardous waste. The oily solids <br />have been containerize in a drum and will be scheduled for proper disposal. The compressor unit has <br />been identified as a ba order and is scheduled for removal and will be returned to the manufacturer. <br />Item #303: <br />The fire extinguishers wre tested and replaced as necessary to assure proper operation in time of <br />emergency. The fire ext nguishers were inspected and tested on February 11, 2016. The eye wash <br />