My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2200 - Hazardous Waste Program
>
PR0220100
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:03:22 PM
Creation date
5/1/2020 4:15:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220100
PE
2227
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is f <br />ENGINEEtING, INC. <br />April 6, 2009 <br />Union Pacific Railroad <br />9451 Atkinson Street, Suite 100 <br />Roseville, CA 9574 <br />Subject: Unior Pacific Railroad <br />Wast Oil Tanks TNKO-0295 and TNKO-0480 <br />Unior Pacific Railroad Yard — Stockton <br />833 E 8" St <br />Stockon, CA <br />Caim n Engineering Job No 09-16 <br />16922 Old Washington Road <br />Nevada City, CA 95959 <br />Voice/Fax: 530.78.9500 <br />cell <br />cell: 916.704.0824 <br />CalmanEng0carthllnk.net <br />!ssments and Certification <br />The hazardous wastel tanks located at the above referenced facility were assessed on April 3, <br />2009 and have been Oertified to be in compliance with 22 CCR 66295.192. <br />The tank assessment 'ncluded the inspection of tank documentation, daily logs, and an onsite <br />physical inspection o all the plant components from the point of generation to the point of <br />discharge. The components evaluated and certified are included on the attached tank evaluation <br />forms. <br />Per requirements of CCR 66265.192, an assessment page has been completed for each <br />component of the system and are attached to this report. <br />Additionally, a site m p where tanks are located has been included with this report as well as <br />Tank Reports, Location Reports and Facility Reports from the Spill Prevention Control and <br />Countermeasure (SPCC) plan. <br />I certify under penalty of perjury of law that this document and all attachments were prepared <br />under my direction in accordance with a system designed to assure that qualified personnel <br />properly gather and evaluated the information submitted. Based on my inquiry of the person who <br />manage the system, the information submitted is, to the best of my knowledge and belief, true, <br />accurate, and complete. I am aware that there are significant penalties for submitting false <br />information, including the possibility of fines and imprisonment for knowing violations <br />
The URL can be used to link to this page
Your browser does not support the video tag.