Laserfiche WebLink
Untitled <br />• Quickly get all available ir fon-nation from the First Responder. <br />• Dispatch the First Responc er to notify other personnel of the emergency. <br />• Quickly re-evaluate the ch iracter, source, amount, and extent of the released material. <br />• Notify the fire department and/or police of the fire by dialing the number(s) listed in Master Emergency Call list or by dialing <br />911. <br />• Evacuate all non-essential personnel out of the danger area. <br />• If necessary, activate the emergency shutdown system. <br />• Determine the extent of injuries and arrange for medical assistance, as necessary. <br />• Assess potential hazard to human health and environment (both direct and indirect) and if there is a threat to human health or <br />the environment outside tf e Facility, then: <br />o notify the police d fire departments that evacuation may be necessary and work with the police/fire departments to <br />decide if evacuatic n is necessary <br />o notify the on -scene coordinator or National Response Center (800-424-8802) and report the following: <br />o name and telephor e number of person making the report, <br />o name and address f the Facility, <br />o time and type of i cident (e.g., fire), <br />o name and quanti of material(s) involved, <br />o the extent of inju es, if known, and <br />o the possible hazar s to human health or environment outside the Facility <br />• Take all reasonable meas res to ensure that fires, explosions, and releases do not occur, recur, or spread to other hazardous <br />wastes at the Facility. <br />• Document all actions and complete appropriate reports and notifications, including noting the following information in the <br />Facility operating record: time, date, and details of the incident that required implementation of the Plan. <br />• Within 15 days after the ' cident, a written report must be submitted to the designated state authority including the following <br />information: <br />o name, address, an telephone number of the operator <br />o name, address,I telephone number of the Facility <br />o date, time, and ty e of incident (e.g., fire, explosion) <br />o name and quand of material(s) involved <br />o the extent of inju ies, if known <br />o an assessment of ictual or potential hazards to human or the environment <br />o estimated quantiti, and disposition of recovered material that resulted from the incident. <br />Immediately after the emergf <br />contaminated soil, or surface <br />Prior to restarting operations at <br />• No waste that may be in <br />procedures are complete <br />• All emergency equipme: <br />available in the event of <br />• Notify the Regional Adr <br />Action Plan - Hazard <br />In general, most facility pers <br />unless the spill is small, is lir <br />protective equipment is avail <br />First Responder/Coordinator <br />1. Note the location of <br />, the emergency coordinator will provide for treating, storing, or disposing of the recovered wastes, <br />er, or any other material that resulted from the release, fire, or explosion at the Facility. <br />Facility, the primary emergency coordinator will take appropriate steps to assure: <br />with the released material is staged or managed in the area of the incident until cleanup <br />listed in the Contingency Plan is cleaned and fit for its intended use. Appropriate equipment must be <br />iother incident. <br />aistrator and appropriate State or local authority that the Facility is ready to resume operation. <br />Waste Spills <br />will not be responsible for participating in the emergency response to a release of a hazardous waste <br />to the immediate work area, the hazards associated with the waste are known, appropriate personnel <br />and it is possible to clean up the spill promptly and safely. <br />the Area: Should a spill of hazardous waste occur, the following actions should be taken: <br />type and amount of material spilled, any injuries and the potential threat to human health or the <br />http://home.www.uprr.co t Idepts/EnvMgmt/Ceps/document/act-hwp.htm 7/23/02 <br />