Laserfiche WebLink
Describe the final disposition of the overburden: It will be used to <br /> reclaim the pit. <br /> Indicate the maximum working slope: Near vertical <br /> OPERATION CHARACTERISTICS <br /> Describe any processing to be done on-site: A mall portable plant for <br /> screening and crushing aggregates <br /> List type of equipment or machinery used in the project and method <br /> of excavation: Loaders, dozers, scrapers, draglines, truck scales, screens, <br /> rock crushers, uI rigs ancl otner appropriate mining equipment. s an�c--- <br /> s 01 equ'Fnent Rey change tram - <br /> List equipment or processes used in this project that generate air <br /> pollutants or required an Air Pollution Control District permit: <br /> A portable screening and crushing plant. <br /> List any operations which will cause noise or vibration: <br /> Most operations involved with ming create a certain amount of noise analor <br /> V15ration. <br /> Describe any trees or vegetation be removed: <br /> Apricot and almond orchards. <br /> List all noxious weeds on the site: <br /> Not aware of any. <br /> Where will materials be stockpiled: In our existing plant area and <br /> temporary stockpiles on the property. <br /> If explosives will be used, explain: N/A <br /> Usual days and hours of operation: 5 a.m. to 12 a.m. (midnight) Monday <br /> through Saturday with no linuts on maintenZuice. <br /> If any canal, pipeline, railroad, etc. , will be crossed, explain: <br /> haul road to our existing plant will cross the pipelines and the Delta <br /> NJendota Canal. <br /> Quarry Excavation - 11 - (7/64 ) <br />