Laserfiche WebLink
r <br /> Describe any trees or vegetation to be removed: <br /> Apricot and alnond orchards. <br /> Describe the haul route to the public road and the means of dust <br /> control The entrance located on Corral Hollow Rd. at-id the haul road to our <br /> existing plant will spray -withsprayea-with water or magn ise an EFTori e as n <br /> Amount and source of water used: The only water used will be to control <br /> dust and will be provided by existing sources. <br /> Describe the method of water disposal: Water will be retained on site <br /> and will be allowed to percolate or evaporate. <br /> Describe the means of preventing water pollution and turbidity <br /> increases in ground and surface water: All surface water will be <br /> retained on site. <br /> If. the project adjoins any river course, levee, floodplain or other <br /> water feature, describe the hydrology and proposed means of pro- <br /> tecting the watercourse: The project adjoins both the California Aqueduct <br /> and the Delta Mendota Canals. THey wiii be proURted by se s. <br /> REHABILITATION <br /> Describe the ultimate use of the property when the project is <br /> complete: The property will be returned to agricultural uses. <br /> Describe the rehabilitation schedule. If the excavation will be <br /> conducted in phases, clearly describe the phasing. Attach charts , <br /> maps, or diagrams to show what operations will be conducted in each <br /> area during each phase: At the conclusion of mining, all sloped areas <br /> will be graded to 1.5 to 1 or shallower. Available topsoil will be-replaced <br /> on the mined areas and will be available for+ a icultural uses. All slopes <br /> will be seeded with natural grasses to prevent erosion. Hee t a-)1 1 <br /> State the proposed means of financially guaranteeing rehabilitation <br /> of the excavation: Bonding, if required. <br /> Quarry Excavation -- 12 -- ( 7/84 ) ` <br />