My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013201
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
29272
>
2600 - Land Use Program
>
QX-86-4
>
SU0013201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 12:17:37 PM
Creation date
5/4/2020 10:59:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013201
PE
2600
FACILITY_NAME
QX-86-4
STREET_NUMBER
29272
Direction
S
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
25310002
ENTERED_DATE
4/30/2020 12:00:00 AM
SITE_LOCATION
29272 S CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . Planning Division: <br /> a. Excavation into the groundwater aquifer is prohibited. <br /> b. The Excavation and Rehabilitation Plan shall be revised so <br /> that rehabilitation in each phase is commenced prior to <br /> the second year of excavation in that phase . The revised <br /> plan shall be submitted to the Planning Division within <br /> thirty (30) days of application approval . <br /> c . Prior to utilization of the Tracy Boulevard haul route, <br /> the applicant shall submit to the Planning Division a <br /> recorded document showing that the U. S . Bureau of <br /> Reclamation has granted the applicant a project access <br /> easement over the Tracy Boulevard haul road. <br /> d. The applicant shall comply with the request of Chevron <br /> U. S .A. for work to be performed at the haul road crossing <br /> over Chevron' s 18-inch crude oil pipeline . Prior to uti- <br /> lization of the Tracy Boulevard haul route, the applicant <br /> shall submit to the Planning Division a letter from <br /> Chevron stating that the requested crossing work has been <br /> completed. <br /> e . Prior to the commencement of operations, the applicant <br /> shall submit to the Planning Division a financial guaran- <br /> tee for Phase I rehabilitation. The guarantee is to have <br /> been previously approved as to its amount by the <br /> Department of Public Works and as to its form by County <br /> Counsel . The same procedure is to be followed prior to <br /> the commencement of excavation in each subsequent project <br /> phase . <br /> f . The applicant shall submit to the Planning Division an <br /> annual , written report prepared by a licensed civil <br /> engineer . This report shall describe the Phase II <br /> compliance status relative to the requirements of the <br /> County Planning Title and to the conditions of approval <br /> adopted as part of this permit approval . The report shall <br /> also describe the excavation and rehabilitation completed <br /> in the preceding twelve ( 12 ) month period. The first <br /> report shall be submitted April 1 , 1987 . <br /> g. The applicant shall submit to the Planning Division veri- <br /> fication that the project has received all necessary plan, <br /> permit, or program approvals from the Regional Water <br /> Quality Control Board, no later than sixty (60) days from <br /> the date of application approval . <br /> h. Operations may be conducted Monday through Saturday, <br /> between the hours of 5 :00 a.m. and midnight . <br /> Conditions of Approval - 2 - (QX-86-4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.