My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
OAK
>
2478
>
2900 - Site Mitigation Program
>
PR0541551
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 12:22:43 PM
Creation date
5/4/2020 12:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541551
PE
2965
FACILITY_ID
FA0023821
FACILITY_NAME
FORMER ARCO #443
STREET_NUMBER
2478
Direction
E
STREET_NAME
OAK
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14124023
CURRENT_STATUS
01
SITE_LOCATION
2478 E OAK ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Rusty Benkosky,Stantec Consulting Corporation March 23,2009 <br /> Well Installation Data Package Project No.E443-01 <br /> Former ARCO Station No.443,Stockton,CA <br /> Page 3 <br /> Date: December 3, 2008 <br /> On-Site Supplier Representative: Allan Dudding <br /> Scope of Work Performed: Finish drilling MW-8 from 60 to 95 feet bgs using 18-inch <br /> diameter augers. Conductor casing installed inside the hollow-stem augers, but not <br /> grouted in place. <br /> Variations from Work Scope: None noted <br /> Unusual Field Conditions: None noted <br /> Date: December 4, 2008 <br /> On-Site Supplier Representative: AllanDudding <br /> Scope of Work Performed:Begin grouting inside 18-inch hollow-stem augers. <br /> Variations from Work Scope <br /> Unusual Field Conditions: None noted <br /> Date: December 5, 2008 <br /> On-Site Supplier Representative: Allan Dudding <br /> Scope of Work Performed: Top 5-foot section of 18-inch auger string removed from the <br /> ground by clearing soil around it with airknife. Finish grouting conductor casing to <br /> surface. After placing a wood plug on the conductor opening, the surface was patched <br /> with concrete pending future well completion. <br /> Variations from Work Scope: During grouting, the SJCEHD inspector present on site <br /> requests that the augers not be turned during grouting. After partial grouting and <br /> removing 15 feet of 18-inch auger, the rig broke down; after exhausting all options, <br /> 80 feet of 18-inch augers are left in the hole. <br /> Unusual Field Conditions: None noted <br /> Date: December 8,2008 <br /> On-Site Supplier Representative: Allan Dudding <br /> Scope of Work Performed: Drilled MW-8 to 100 feet bgs using 8-inch diameter augers <br /> inside the conductor casing,no sample collected. <br /> Variations from Work Scope: 10-inch hollow-stem augers were having difficulty turning <br /> inside the conductor casings. Driller was concerned that the augers would cause the <br /> conductor to spin, disrupting the grout well seal. <br /> Unusual Field Conditions:None noted <br /> K:OP-ARCO Exmute'443\2009 Data packageMrco-443_Well Installation_Data Package.doc k <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.