My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
OAK
>
2478
>
2900 - Site Mitigation Program
>
PR0541551
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 12:22:43 PM
Creation date
5/4/2020 12:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541551
PE
2965
FACILITY_ID
FA0023821
FACILITY_NAME
FORMER ARCO #443
STREET_NUMBER
2478
Direction
E
STREET_NAME
OAK
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14124023
CURRENT_STATUS
01
SITE_LOCATION
2478 E OAK ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> Mr.Rusty Benkosky,Stantec Consulting Corporation March 23,2009 <br /> Well Installation Data Package Project No.E443-01 E <br /> Former ARCO Station No.443,Stockton,CA <br /> Page 4 <br /> _ �f <br /> I <br /> c <br /> Date: December 10,2008 I <br /> On-Site Supplier Representative: Allan Dudding <br /> Scope of Work Performed. Installed monitoring well MW-5 to 65 feet bgs. <br /> Variations from Work Scope: None noted <br /> Unusual Field Conditions:None noted <br /> Date: December 12, 2008 <br /> On-Site Supplier Representative: Tony Hill and Chris Grant <br /> Scope of Work Performed. Quarterly monitoring and sampling. <br /> Variations from Work Scope: Well MW-5 was developed immediately prior to sampling. <br /> These activities were previously reported in a document titled Groundwater Sampling <br /> Data Package, dated January 5, 2009. <br /> Unusual Field Conditions:None noted { <br /> Date: February 9,2009 <br /> On-Site Supplier Representative: Scott Bittinger I <br /> Scope of Work Performed: Drill borehole MW-8 to 119 feet bgs using 8-inch diameter j <br /> augers, sampling continuously. <br /> Variations from Work Scope: None noted. <br /> Unusual Field Conditions: None noted. j <br /> Date: February 10, 2009 ! <br /> i <br /> On-Site Supplier Representative: Scott Bittinger f <br /> Scope of Work Performed: Installed monitoring well MW-8. Casing installed to 113 feet <br /> bgs, screen installed from 103 to 113 feet bgs to match encountered subsurface 1 <br /> conditions. Sand and transition seal were installed,but grout seal was not. <br /> Variations from Work Scope: None noted <br /> Unusual Field Conditions: None noted <br /> Date: February 11, 2009 <br /> On-Site Supplier Representative: Collin Fischer <br /> Scope of Work Performed: Installed grout seal to ground surface for monitoring well <br /> MW-8. <br /> Variations from Work Scope: None noted <br /> Unusual Field Conditions: None noted <br /> I <br /> KABP-ARCO Enecute\443\2009 Data packages\A=_443_Well[nstallation_Data Package.doc fI <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.