Laserfiche WebLink
,11 1111a 11 V 11 <br /> a — <br /> February 6, 1989 <br /> Franzia Hrother Winery <br /> Re--excavation Work Plan <br /> Page 4 <br /> TOTEM 8. TIME SCHEDULE —continued <br /> Phase III: <br /> Upon determination of appropriate treatment and when <br /> ambient temperature is conducive to effective treatmeednt <br /> by aeration or biodegradation, permits will be app <br /> li <br /> for and treatment will commence. The 5ai1 will be <br /> t - treated until acceptable levels are attained per San <br /> ja aquin Local Health Districv standards. <br /> 3 <br /> 4+. <br />